My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Sep'10 Oct 110 Nov'10 Dec'10 Jan'll Feb '11 Mar'l1 Apr'l1 May'l1 Jun '11 Jul'l1 Aug '11 Sep '11 Oct 111 <br />22 29 5 12 19 26 3 10 17 24 _31 7 !14 21 28 5_ 12 19 26 2 9 16 23 !30 1 6 13 20 27 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 !21 28 4 11 18 25 2 9 1 <br />Ventilation for elevator controls (duplicate) <br />p Low gas pressure in cameras <br />6418 Elevation <br />Seal Strainer Drain <br />Oil Leaks on Sump Pumps <br />4 Oil Leaks on Pumps /Motors <br />Fix Intermittent RTD Problems <br />p Repair INPRO Seal Leaks <br />Grout under MOBVs <br />on J -box for Tiger Flow Unit' <br />r Backwash Lid not Securedl <br />it on Crane Access Platforrr4 <br />6432 Elevation v <br />Cavitation issue <br />Verif <br />Gage on Sump Drawdown Pump Broken <br />Remove PVC Pipe from Piping Area <br />Strainer Air Valve E5 Leaking 0 <br />Remove or Mount Fire extinguisher Between Units 4, 5 1 <br />Remove Cardboard in Expansion Joint <br />Loose nut on Cantileverd Walkway, North end 0 <br />Leak and Insul I <br />pen Overhead by Intake Ducq <br />t Water Control Valve Leaks= <br />Properly Store Spare Belts for main air handler Currently in Unit <br />Door Latch on main air handler Not Working l <br />Project: ALP O &M TRANSFER ISSUE Task Milestone p Rolled Up Task Rolled Up Progress External Tasks _ _ �� Group By Summary <br />Date: Sun 3/4/12 Progress Summary =_ Rolled Up Milestone O Split Project Summary Deadline O <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.