ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Nov'l1 Dec '11 Jan '12 Feb'l2 Mar'12 Apr'12 May'l2 Jun '12 Jul'12 Auq'12 Sep'12 Oct'12 Nov'12 Dec'l2 <br />16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 1 2 9 16 23 30 7 14 21 28 4 11 18 25 2 <br />Verify COD Air Chamber Installation <br />Factory Test Reports Pump /Motors <br />Pump /Motor Coupling Baseline Data <br />Shipping Braces for Motor Rotors <br />Baseline Megger all Motors <br />Install SEBs on Pumps <br />Relocate Mech Seal Site Glass <br />B -Flys Differential Pressure issue <br />Repair Pump Coatings and rebuild units <br />Repair Mechanical Seal Leaks <br />Blind flanges, 2 each for each size unit <br />Move Motor Temp. Gages to Visible Location �i <br />Elevator Pit high Water Detection � <br />rify Control Wiring to Tiger Flow <br />Remove Deluge Valve Ga <br />Relocate Piping South Unit Bay Wall <br />Cap Cross - Connect to Seal Water � <br />ken <br />Check Interior Coating Service Air Receiver, shows Rust <br />Grout under Strainers Cracked and Unsightly <br />Broken Sight Glass on Both Strainers <br />Wa Ikway Mounting Brackets Corroded from Leak through Wall <br />Broken Light Cover on Walkway, near Unit 6 <br />Access Covers on EIM Operators not Secured i <br />6432 Elevation <br />Check Valves at Sewage Ejector a <br />ulation on Hot Water Circ. Pump <br />Conduits Supports on Sump Pumps Need Repair <br />SEB's replaced <br />6418 Elevation <br />Repair Insulation On Hot Water Control Valve <br />Replace Flex Conduit on Fire Damper, N Dt Spec <br />Project: ALP O &M TRANSFER ISSUE <br />Task Milestone Rolled Up Task Rolled Up Progress External Tasks _ _ _ O Group By Summary <br />Date: Sun 3/4/12 Progress Summary W Rolled Up Milestone O Split Project Summary Deadline <br />Page 16 <br />