My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La Plata Project Water Supply Demand Study
CWCB
>
ALP Project
>
Animas-La Plata Project Water Supply Demand Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:52:06 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANIMAS - LA PLATA WATER SUPPLY AND DEMAND STUDY <br />2. COST ANALYSIS <br />2.1 Capital Cost for A -LP Project Water <br />The repayment obligation of non - federal entities for a project constructed by the USBR is a detailed and <br />complex subject. The information presented below is correct for the circumstances of the State of Colorado <br />repaying the federal government for all, or a portion, of the 10,460 AF of annual yield from the A -LP Project <br />water to the best of Brown and Caldwell's ability as of the date of this report Qanuary 2010). However, the <br />interested reader is cautioned against extrapolating further conclusions beyond the narrow conditions of this <br />report without exploring these in full with knowledgeable personnel of the USBR. <br />2.2 SCHEDULE FOR PURCHASING STATE'S ALLOCATION <br />An inquiry was made to the USBR concerning if there was a deadline by which the State had to indicate it <br />would purchase all or a portion of the 10,460 AF allocation? The response was: <br />"Thc 2000 Settlement Amendments state that the repayment obligation of the non -Tribal <br />entities is subject to final cost allocation. This could be interpreted to mean that the State <br />has until final cost allocation to decide whether or not to participate in the A -LP Project; <br />however, in order to ensure that the final cost allocation is completed in a timely and <br />efficient manner, it is imperative that the State make a commitment regarding its <br />participation in the A -LP Project sooner rather than later." <br />2.3 CAPITAL COSTS <br />If the State of Colorado (State) decides to purchase A -LP Project water, the State will have to pay its share of <br />project capital costs. If the State were to purchase all 10,460 AF allotted to the State, this will amount to <br />$27,954,506 (in October 2009 dollars, see note 1, Appendix B). <br />The State could pay the capital costs in one lump sum payment or make annual payments over a 40 -year <br />period at the present interest rate of 8.135 percent which will result in an annual payment of $2,775,556 per <br />year (see note 2, Appendix B). The basis for the 40 -year repayment period and the 8.135 percent interest rate <br />is further explained in note 3, Appendix B. <br />In addition to this annual payment for the capital costs, the State will also be required to pay its share of IDC <br />from the day construction started as explained in the next section. <br />2.4 INTEREST DURING CONSTRUCTION (IDC) <br />If the State decides to purchase A -LP Project water, it will have to pay its share of the project IDC costs. <br />IDC is calculated at the 8.135 percent rate. If Colorado decides to make a lump sum payment for the capital <br />costs, the State will still owe its allocated share of accumulated IDC to date. <br />As of September 30, 2009, the IDC accumulated for Colorado was $6,719,900 (see note 4, Appendix B). The <br />State can avoid making additional IDC and interest payments by making a lump sum payment for the full <br />2 -1 <br />PADala \GEN \CWCB\138372 - Animas -La Plata Demand Study \Deliverables\Reports\Flnal\ALP Cost Demand Study Final Reporl.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.