My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 19
CWCB
>
ALP Project
>
ALP 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:42:58 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`` <br />List of documents and Document No. Document Title <br />• <br />attachments R10AV40R04 Recovery — Permanent Operating Facility, Animas -La Plata F -1 <br />Pro'ect No. 1000 TAS::14 0681::TAS <br />PART F -- LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS <br />F.1 Applicability of Documents <br />The documents, exhibits, and other attachments which are identified in this Section F, <br />apply to and are a part of this contract. In the event that any document is missing in <br />whole or in part from this document when received, the Contracting Officer shall be <br />notified immediately. <br />F.2 List Of Contract Documents <br />Attachment <br />No. <br />Title <br />No. of <br />1 • <br />Master Contract of General Provisions for Self <br />Pages <br />Determination Construction Contracts for Construction <br />143 <br />of Ridges Basin Dam, Inlet Conduit, Durango Pumping <br />Plant, and Appurtenant Facilities of the Animas -La Plata <br />Project, Durango, Colorado, dated October 7, 2002 <br />2• <br />Addendum to Tribal Contracting Agreements to <br />6 <br />Transfer Funds Pursuant to the American Recovery and <br />Reinvestment Act of 2009 <br />3. <br />DOI Construction Checklist, entitled Reclamation NC <br />5 <br />Guiding Principles Checklist, 10/12/09 <br />4. <br />Davis Bacon Wage Rate <br />5. <br />Drawings <br />8 <br />6• <br />Performance Schedule <br />4 <br />7. <br />Draft Source Selection Plan, Two Phase Design <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.