My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 18
CWCB
>
ALP Project
>
ALP 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:10:53 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — October 05, 2010 <br />Version: October 5, 2010 <br />11. Fruitland reach laying pipe <br />12. View of NNMP pipeline showing anchor blocks <br />13. View of Nenahnezad storage tank foundation <br />14. View of tank base welding <br />15. View of welding the first and second courses of the tank <br />16. Distant view of tank construction <br />H. 90 -Day Look Ahead <br />1. Durango Pumping Plant <br />a. Maintain pumping as river allows <br />b. Complete punchlist items <br />c. Complete repairs to all pumps and motors <br />d. Landscaping activities continue (weed control) <br />e. Start installation of SCADA system <br />f. Continue arc flash study <br />g. Correct ice dam issues on roof <br />2. Ridges Basin Inlet Conduit <br />a. Receive reply to BOR test report response for cathodic protection system <br />b. Dewater and perform annual inspection of inlet conduit <br />3. Ridges Basin Dam <br />a. Complete punchlist mechanical /electrical equipment <br />b. Continue sleeve valve testing for fish mortality <br />c. Continue First Fill monitoring <br />4. Security and Communications Contract <br />a. Perform second maintenance visit <br />5. Recreation — Boat Ramp (non - federal) <br />a. Complete construction of parking area <br />b. Install gates and guardrail on access road <br />6. Upper County Road 211 <br />a. All work on CR211 (210) is complete <br />7. Navajo Nation Municipal Pipeline <br />a. Fruitland Reach <br />i. Complete pipe - laying operations <br />ii. Substantial completion <br />b. City of Farmington Reach <br />i. Complete pipe - laying operations <br />ii. Substantial completion <br />c. Horizontal Directional Drilling <br />i. Contract closeout <br />d. Schedules 2 through 6 <br />i. Mass excavation to continue <br />ii. Pipe laying to continue <br />iii. Complete tank at Nenahnezad Hill <br />8. Permanent Operating Facility <br />a. Negotiate construction costs <br />b. Commence construction <br />I. First Fill <br />1. Lake Nighthorse First Fill Actual Power Billing Data through June 2010 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.