Laserfiche WebLink
Roads Reconstruction <br />Modifications Update, U <br />per CR 211( #8216' <br />April 2011' <br />• Six undefinitized modifications pendina finalization <br />• #15 — Outfall Basin Riprap Repairs — est $21,600 <br />• #20 — Boat Ramp Access Turnaround — est $22,655 <br />• #21 —Additional CR210 Approaches — est $7,246 <br />• #23 — Rock Check Dams at CR210 groin erosion areas— est $2,600 <br />• #24 - LPWWA check dams and erosion mitigation — est. $18,000 <br />• #27 - Boat Ramp Road redesign effort — est. $225,716 <br />Requests for Proposal (RFP) pending <br />