Laserfiche WebLink
90 -DAY LOOK AHEAD (April 2011) <br />• Durango Pumping Plant <br />- Maintain pumping as river allows <br />- Complete punchlist items <br />- Complete of SCADA system <br />- Correct ice dam issues on roof <br />- Commission the boiler system <br />- Determine permanent crest gate operation method <br />ges Basin Dam <br />omplete punchlist mechanical /electrical equipment <br />:ontinue sleeve valve testing for fish mortality <br />ontinue First Fill monitoring <br />erform Basin Creek flow test <br />