My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 16
CWCB
>
ALP Project
>
ALP 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 11:09:01 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f.4. Instrumentation Costs <br />The S reamPros, FlowTrackers, and Argonaut are items that can be rented at various rates. The <br />press ire transducers and staff gage will need to be purchased. Both Tracy Vermeyen and Del Smith <br />have ne FlowTracker and one StreamPro. Del Smith's instrumentation was purchased on a research <br />proje t and as such he doesn't charge a usage fee. Tracy's equipment was purchased outright and there <br />is a di ily fee associated with using his equipment. The table below summarizes the costs for equipment. <br />It is a sumed that the team working Upper Basin Creek can measure flows at close spacing (^'.25 mile) in <br />a 3 dz V period. The biggest cost in the table below is the Argonaut, and this is a high end estimate. If <br />the E uilibration period doesn't take 13 days and if the flows recede relatively quickly (the Argonaut can <br />no to er measure discharge) then the instrument can be removed in less than 50 days. <br />The O <br />assurr <br />office <br />set loggers (2), shuttle, and software, as well as the staff gage will need to be purchased. It is <br />!d that Tracy Vermeyen will install the SonTek Argonaut SW in CR213 and that the construction <br />rill install the staff gage and pressure transducers. <br />Equipment Fees (Rent) <br />Source <br />Cost /Day <br />Day <br />Cost <br />FlowTrackerl <br />TV <br />85 <br />3 <br />$ 255 <br />FlowTracker2 <br />DS <br />0 <br />9 <br />$ - <br />StreamProl <br />TV <br />200 <br />3 <br />$ 600 <br />StreamPro2 <br />DS <br />0 <br />9 <br />$ - <br />Argonaut <br />TV <br />100 <br />50 <br />$ 5,000 <br />Equipment Cost (Purchase) <br />Unit Cost <br />Count <br />Onset Loggers <br />Onset <br />500 <br />2 <br />$ 1,000 <br />Onset Shuttle &Software <br />Onset <br />330 <br />1 <br />$ 330 <br />Staff Gage <br />$ 50 <br />Equipment Sub Total <br />$ 7,325 <br />Installation Labor <br />TV <br />936 <br />1 <br />$936 <br />Equipment Installation <br />The Soi iTek Argonaut will be installed by Tracy Vermeyen at a maximum cost of $936. The staff gage <br />and prE ssure transducers will be mounted by construction office personnel. Installation instructions and <br />locatioi is will be provided to the construction office once this document has been reviewed and the <br />general approach has been agreed upon. <br />5.$. Flow Release Test Costs <br />This tat le summarizes the cost estimates which includes labor, travel, equipment, and data processing. <br />This is a high estimate, with probably the biggest over - estimate being Lisa Fotherby's labor. I've got her <br />as beinj present starting at time t =0 (beginning of groundwater charge) and staying through team 1 <br />measur ments. She will update her availability after reviewing this document. <br />
The URL can be used to link to this page
Your browser does not support the video tag.