Laserfiche WebLink
Animas -La Plata Project <br />Cost Allocation Workshop <br />July 8, 2010 <br />Draft Agenda <br />1. Approval Process <br />g : 3 a cc, /-) <br />2. Cost Allocation Method — Use of Facilities; Origination of cost info; <br />Explanation of Specific Costs and Multipurpose costs <br />3. Cost Allocation vs. Repayment <br />4. Conformation to the October 2001 Interim Allocation <br />5. Current Cost Allocation walk through <br />6. Incorporation of the 207 Reimbursable Cap with indexing <br />7. Calculation of IDC <br />8. Schedule (When the process can start and how long it will take to <br />complete.) <br />