Laserfiche WebLink
Project: Cucharas Reservoir and Dam Rehabilitation Project <br />Borrower: Huerfano Cucharas Irrigation Company <br />Project: <br />Construct a new dam at Cucharas Reservoir bringing back 35,395 AF of storage to ag users in the <br />Arkansas Valley. SEO restriction has been in place since 1988 and a breach order could be imposed by <br />Oct. 1, 2010 if repairs are not made. <br />Project Costs: <br />Dam Repair $19,460,000 <br />CWCB Loan $9,900,000 $99,000 $9,999,000 <br />--------------- - - - - -- ------------------------- <br />Additional Funds needed for dam $9,560,000 <br />Total Project* $30,739,000 <br />-- --------------- - - - - -- ------------------------------------------------- <br />Additional funds needed for TOTAL project $20,839,000 <br />*Includes: admin fees, permitting, land purchased for farming, equipment (i.e. center pivots) <br />Borrower: <br />Huerfano Cucharas Irrigation Company (Irrigation Company) <br />Irrigation Company = HCIC, LLC (74 %) ** + original shareholders (26 %) <br />* *HCIC, LLC has contracts to buy up to 79% of the original shares and expects to own 95% ultimately <br />HCIC, LLC = Two Rivers Water Company (50 %) + Two Rivers Basin Company (50 %) <br />Two Rivers Water Company is the parent company to: <br />• Two Rivers Basin Company <br />• Two Rivers Farming <br />• Two Rivers Energy <br />• Northsight (development company being liquidated) <br />Two Rivers Water Company has contributed $3,670,000 to date to Irrigation Company towards the <br />project. Water Company plans on reintroducing ag production to the area serviced by the Irrigation <br />Company. It will do this through Two Rivers Farming. <br />Two Rivers Farming will lease water from HCIC, LLC. Two Rivers Farming is planning to prepare 500 AC <br />for planting in the 2010 growing season. <br />Former shareholders in the Irrigation Company that want to keep farming can lease the water back from <br />HCIC, LLC at $10 /AF through long term leases. <br />