My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 16
CWCB
>
ALP Project
>
ALP 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 11:09:01 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cost Allocation Terms <br />■ Specific COStS — costs of a feature that can service <br />only one purpose <br />Boat ramps, campground - Recreation <br />Laterals and drains - Irrigation <br />Separable COStS — costs of a feature that could be <br />omitted from the project if a single purpose were <br />removed <br />Piping & values to sole participant <br />Capacity sizing for a dam or pipeline <br />JOint COStS — costs of a feature which serve more <br />than one purpose <br />Multiple use capacity of a dam or canal <br />Cost Allocation Comparison <br />Mav 2001 Interim Allocation <br />Use of Facilities Method <br />No separation of Section 8 costs <br />from joint cost allocation <br />Included $68M of sunk costs with <br />$22.703M allocated to irrigation <br />Current Allocation <br />Use of Facilities Method <br />Section 8 costs separated prior to allocation <br />of joint costs <br />Included $68M of sunk costs with <br />$22.703M allocated to irrigation <br />Allocation of inactive pool between Allocation of inactive pool between F &WL <br />F &WL enhancement and mitigation enhancement and mitigation based upon <br />without clear definition straight percentages 23% and 77 %. <br />$40M Resource Fund included in $40M Resource Fund not included in <br />allocation allocation <br />
The URL can be used to link to this page
Your browser does not support the video tag.