Laserfiche WebLink
Cost Allocation Terms <br />■ Specific COStS — costs of a feature that can service <br />only one purpose <br />Boat ramps, campground - Recreation <br />Laterals and drains - Irrigation <br />Separable COStS — costs of a feature that could be <br />omitted from the project if a single purpose were <br />removed <br />Piping & values to sole participant <br />Capacity sizing for a dam or pipeline <br />JOint COStS — costs of a feature which serve more <br />than one purpose <br />Multiple use capacity of a dam or canal <br />Cost Allocation Comparison <br />Mav 2001 Interim Allocation <br />Use of Facilities Method <br />No separation of Section 8 costs <br />from joint cost allocation <br />Included $68M of sunk costs with <br />$22.703M allocated to irrigation <br />Current Allocation <br />Use of Facilities Method <br />Section 8 costs separated prior to allocation <br />of joint costs <br />Included $68M of sunk costs with <br />$22.703M allocated to irrigation <br />Allocation of inactive pool between Allocation of inactive pool between F &WL <br />F &WL enhancement and mitigation enhancement and mitigation based upon <br />without clear definition straight percentages 23% and 77 %. <br />$40M Resource Fund included in $40M Resource Fund not included in <br />allocation allocation <br />