My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 16
CWCB
>
ALP Project
>
ALP 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 11:09:01 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and Lousing of the maintenance support equipment, storage place for supplies, and equipment <br />"Project" means the Animas -La Plata Project, a participating project of the Colorado <br />River Storage Project Act, authorized by Title V of the Colorado River Basin Project Act, <br />September 30, 1968, as modified by the Settlement Act, as amended. <br />) "Project Construction Committee" means the committee made up of representatives of <br />entities that have been identified by the Settlement Act, as amended, to receive a water <br />and the Bureau of Reclamation. This committee has provided and will provide <br />and consultation on the construction activities among all the project beneficiaries, <br />common understanding and consensus on decisions associated with such items as final <br />for Project Works, project construction completion schedule, and Project construction <br />"Project Operator" means the Association operating the Project Works. <br />"Project Water" means all water provided through the Animas -La Plata Project. <br />) "Project Works" means all works or facilities as described in the Settlement Act, as <br />to be constructed under the Project, including a reservoir, a pumping plant, a reservoir <br />conduit, and appurtenant facilities with sufficient capacity to divert and store water from the <br />River for an average annual depletion of 5 7, 100 acre -feet of water to be used for a <br />icipal and industrial water supply, together with lands and rights -of -way for such works, as <br />in Article 2 herein. <br />(1) "Remaining Repayment Obligation" means the difference, if any, between the <br />Repayment Obligation and the Final Repayment Obligation as determined through the <br />Cost Allocation described in Articles 7(d) and 7(g) below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.