Laserfiche WebLink
FAC 01 -05 <br />Reclamation Manual <br />Directives and Standards <br />(6) The effective date of the transfer. <br />(7) A description of the general condition and sufficiency of the structures and <br />equipment being transferred. <br />(8) The availability of necessary equipment and instructions, required construction <br />documentation, including Designers' Operating Criteria, Design Summary, revised <br />Standing Operating Procedures, Emergency Action Plan, first filling and <br />monitoring criteria, and other appropriate operating documents. Where the <br />required instructions and documentation are not completed, a schedule for their <br />completion will be included. <br />(9) The status of "as- built" drawings and a construction report. These documents are <br />to be finalized within 3 months of completion of construction. The cost to prepare <br />the drawings and report will be charged to construction funding. If the drawings <br />and construction report are not completed at the time of transfer, a schedule for <br />their completion will be included. <br />(10) Deficiencies found during the inspection with information on which organization is <br />responsible for correcting each deficiency and the funds to be used in accordance <br />with existing budgetary policies. Include work items needing completion, <br />recommendations made during the transfer inspection, observations not considered <br />construction deficiencies but which would be valuable information for future <br />examiners, and photographs of newly constructed or modified features as well as <br />other items noted in the inspection report for future reference. <br />D. Transfer Inspection Report Routing and Copies. The office responsible for <br />construction or the associated area office will prepare and process the inspection report <br />for concurrence by the responsible Regional Director and operating office or water user <br />organization. After concurrence signatures of the Regional Director, Area Manager, <br />and water user organization official(s), if appropriate, the area office will send a copy of <br />the inspection report to the Commissioner, Attention: D -5500, within 60 days of the <br />inspection. Copies of the report will also be sent to specific offices within the region <br />and area offices which need to be aware of the official transfer, to the water user <br />organization, if appropriate, and to those who participated in the transfer inspection. An <br />example of a transfer concurrence memorandum is attached as appendix A. <br />6. Cost of a Transfer Inspection. For a facility being transferred from construction status to <br />Reclamation or water user O &M status, the cost for conducting the transfer inspection will <br />be charged to construction funding. For a facility being transferred from Reclamation O &M <br />(55) 7/22/97 Page 4 <br />NEW RELEASE <br />