My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 16
CWCB
>
ALP Project
>
ALP 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 11:09:01 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 (a) The transfer process will begin upon notification of substantial completion by the <br />2 Four Corners Construction Office. The Western Colorado Area Office shall notify the <br />3 Association upon receipt of the notification. Thereafter Reclamation shall conduct a transfer <br />4 inspection in Consultation with the Association. Reclamation will then prepare a report on <br />5 the inspection (the "Transfer Inspection Report"), which will contain- <br />6 (1) a detailed list of the facilities and of the movable property and equipment to be <br />7 transferred, together with: (a) a description of manufacturers' warranties to be provided <br />8 and/or transferred to the Association in connection with the Transferred Works and other <br />9 facilities and property to be transferred; (b) pertinent design, construction, and as -built <br />10 documents for the Transferred Works; and (c) maintenance protocols, equipment <br />11 manuals, and other like items relating to the operation and maintenance of the <br />12 Transferred Works; <br />13 (2) a list of design and construction deficiencies, if airy, identified by the transfer <br />14 inspection in the Transferred Works and other facilities and property to be transferred; <br />15 (3) a plan for correcting any such deficiencies, setting forth: (a) the corrective <br />16 measures to be applied; (b) the entity or entities responsible for undertaking such <br />17 corrective measures, including when they will be undertaken and how they will be <br />18 funded; (c) anticipated completion dates for the corrective measures; and <br />19 (4) any other matters required by Reclamation Directives and Standards. <br />20 (b) Approval by the Four Corners Construction Office, the Regional Director, and the <br />21 Western Colorado Area Office of the Transfer Inspection Report will conclude the transfer <br />22 process from Reclamation construction status to Reclamation OM &R Status. Upon <br />23 conclusion of the transfer process, Reclamation will provide written notice to the Association <br />24 of substantial completion of the Project. Unless hydrologic or unforeseen conditions prevent <br />25 the completion of first fill by August 1, 2012, the first fill of Lake Nighthorse will be <br />26 completed prior to transfer from Reclamation construction status to Reclamation OM &R <br />27 Status. The transfer to Reclamation OM &R status shall not affect Reclamation's obligation <br />28 to complete the first fill of Lake Nighthorse. <br />
The URL can be used to link to this page
Your browser does not support the video tag.