My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
01IAPTER 5 <br />PURPOSE AND NEED, RECOMMENDAI IONS AND COMMITMENTS <br />The polentlal II11pacl U) Ila ive fishes in t o Anklas Wei -, especially the of l'ecls al llbrollic 11;1111,1 <br />%, <br />reduction, nlay not be diwedy nlitip,,olable on the Animas River. Illvesllglatiolls Should be IIIIII:IIed to <br />nl <br />detcriiline. whether Or not fish bi- irriers exist, whelhcr small fish /yaunl; af- Ihc -year lisle are significantly <br />% <br />lost lhrinlgh ellfl -ainin C11t ill callaK and whether any signiIIcurit loss to the trout lishely occurs. I lle <br />nloniinring program will be h0dnted in 21)00 111a1 will incorporate these additional cleluents into ;1 <br />Monitoring study currently beirig coilCluded on the Aninis River. A An rcC1111iniclldalion fell' Illltl`-aholl <br />% <br />due to file Clfecls oil native fishes will be nmde by uo laler than 2005, al least two yens prior to Quo <br />4Y <br />Illlrnpirig Ann the Allllllas River. Once (his rnitigallon recoill ill endatioll Is approved a ld agreed (o by tile <br />Service, t: DOW, New Mexico DeparinlclU of Ganlc. and Dish (NMI)(;1�), ;Intl perhaps the So11111Cr11 I Ite <br />yl <br />Indian ITT, 1(5 ill)plelllellfatloll will Ilnuic- {Itafely begin. This collullllincill is also descl Ibed tuldc'r <br />%, <br />ruitigation R,r Refined Aherriative 4 Aquatic Resources Illlpact 4 in Section 1.6. <br />'y) <br />Rccl;ulla(ion will review and adapt established g',Ilidelines 161. scrccnilig facililies to nlinin)ize fish <br />%, <br />en(rainnlew and inlpingenlenl at the Ridges Basin Pumping Plant, Reclamation will also) ensure M.11 <br />'%, <br />design specifications include, Best Available'fechnologbs as described under Mitigulion fur Relined <br />Mfern live 4 Aquatic Resources Impact s ill Section 3.6. <br />RCClall ation Ivill Culler screen or lillplemall offer physical strtleltims IO Ilreveni live Ilsh korn bclll!' <br />released from Ridges Basin Reservoir. The re choir nutlel sysicn, will be designed and lilted with <br />devices to clinlinale survival of fish escaping, the reservoir. Rcclan n6on will Monitor cscapcnlcnf I'r(,m <br />Ihc r;:servoir and Misin C'rcck as described under initigation fur WNW Alternative 4 A(luatie R- minces <br />Inlpael 7 in Section 3.6. <br />Reclamation will fund the acquisition and stocking of Wilil ,trains of unul ammalb in We Animas River <br />wilh111 file boundaries of The Southern t flit Indian Reservation to collllml.sa(e Ial' lItih loss Mlle lie file <br />reduollnll 111 lisable front habitat. llldlvldtlal stocks elf trout will be inat -ked in such it I11:I1)11C1' that 711'c'' <br />groups could be Illonitored over tulle'. l llij Illoniloring, plall Will be developed in Consultation wilhYtile <br />Service, COOW, NMU(;I'7 and the Tribe. "fhc relafive success ilfnis cfl, will he assessed alicr filar <br />years. 11* it is deemed a success that is, if the trout biomass within U1e stocked reaches of the river is <br />elevated ton point of supporting; a recreational fishery —Ihc stocking, prog;ranl will continue. Fol• the <br />acquisition ol'trouf stock. Reclamation Will consider the devi:mpnlcnt ofa new bm&cry in coo wotion <br />with the Southern Utc Ind iall Tribe and others. This sane, hatchery could very well be ulilii.Cd fill. <br />providing; for fish stocking for Ridges Basin Reservoir. <br />Rcclalnalion will Comnlil to providing Inmi- to he slacked at Rides Basin Reservoir to, provide a <br />%1 <br />recirdional fishery. I Ile source or I Isle could be Irlllll an cAsthig Cohniclo Rlwer Stnral,e Pn&cl <br />'yn <br />(CRSP) hatchery N61ity or Ron We acgNsltion and/or coinimcoan of a new hatchery fac'illly. I I11K <br />% <br />conunitnlent is 1i61- Ihc purposes ofenhancing the fishery al Ridges- Basin Reservoir. <br />% <br />As described in Section 5.4.1 I, Re.clanlation will acquire al least My new public: amen poinis on the <br />'xI <br />Animas River lilt fishing and other recreational use. <br />%, <br />5.4.7 Special Status Species Commitments <br />Reclamation twill inlplemenf conservation measures found in the latest Biological Opinion on the project % <br />(sec Aimchnlcnt G fiw complete. lisQ. 'Fhcsc measures address the C'Oloradn pikeininnow and razorback %, <br />sucker that are Runic! in the San Juan Rivc:r and the bald togle that is round Twughout the pn jecl area. <br />5-15 5.4 ENVIRONMEN rAl_ ( %OMMII'MENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.