My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CFIAP'I I:R 4 <br />OTHER IMP CT GONSIDFRATION i <br />One non -I: Ilding water use scenario Collsideral by the Southern (.Ile Indian 'Tribe involves opening a coal <br />aline and 1 wilding a Coal -fired power plaIll, while the I Ile. Mountain lllc'I'rIbe is Considering build III g;I <br />ga, -hred L owes plant. 'I'll is would ;Illow the Colorado Ilie 'I'rihcs l(i dcvclop I Ile ir coal and nil( lral pas <br />reserves al tile reservation, resultill'. in an economic henclit to the Tribes by providing increasc(I jabs <br />:n d revenl e. <br />Miligalio for Relined Alternative 4 Impact R: No miligation is proposed. <br />Relined : Ilernalive I Impact -Less Illan sipnific:ult: The conslruclion of the. NNNIP may affect <br />6b Nav:►jo Nation I'1'A mineral a'csourecs. <br />Oil and t,a wells, sand ;Ind gravel, and coal resinn'ee; occur near the NNNll'. I:Nlslliw, oil Anil Ps wells <br />;b <br />and nand ; lcl }ravel and coal minim operlllolls Wolild not be alYcctcd, bill ill the l,ulnre the opporunlity <br />'X, to eX(I'il t hesC resuuices could he limilctl to the presence of the pipeline. <br />INjili1;:►lio a for Refined Allcrnalive 4 Impact 4: No mili;;nlioll is proposed. <br />1{clincd f Iternalivc 4 Impact Ill - 11'ess Ihall tii .ynificant: Project dcvi- lopmcnt could negatively <br />,G impact II► Colorado Lite Tribes' launliu� and lishilig rights- <br />'7* projea dcvcloplllcl)l that would neplalively impact Irl,ullily <br />and lisping resources, or access to such <br />Y, resoill-cc .s. wilbiu the lirunot Agreement Arcs or olherwise provided Ihl'Ullrh le-,al .;clilellicnt or consent <br />46 decree, would ncgatively aflecl the. llte Nlounl,lin Ille'llibcs' hnnlin� and lishin� right. <br />-y, lklitigatio 1 liar Refilled Allernative 4 Impact 10: No miligalion is pri►pnsed. <br />{, Refilled " Iternative •4 Impact I 1 - Significant: Refined Allernalivi 4 lin►il:ti I'Iac w:atcr snpph' <br />available liar the development of the proposed Navajo - Gallop Project designed to deliver drill) <ing, <br />water to I iorliions of the Navajo Nation with limited or no su11►ly. <br />See disco sioii under Refined Alternative 4 Impact ;. <br />Mitig;1tio l fol- Relit►ed Alternative 4 Impact I I - 8ee discussion under Milin ;atiun 1'or Rcliucd <br />Alternali e 4 Impact 3. <br />".•5 Relined Ilcrnative it Impact 12 - Si};nilicaut: Refined Alternalive 4 rcdoces the Water supply <br />X> :available liar the .licarilla Apache fribe Vllatcr I{ights in the S,u► .111.►n lt"cr. <br />% Miligilti(I it for Refined Allernative 4 Impact 12 - See discussion nn+ler Milif; <br />
The URL can be used to link to this page
Your browser does not support the video tag.