My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I (f <br />2 those <br />3 nerm <br />4 and h <br />I "Operation and Maintenance Facilities" or "Permanent Operations Facility" means <br />cilities necessary to support operations, maintenance and replacement work, including <br />ent operating facility building headquarters with associated office space, shop for repair <br />using of the maintenance support equipment, storage place for supplies, and equipment . <br />5 yard. <br />6 (i "Project" means the Animas -La Plata Project, a participating project of the Colorado <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />River Storage Project Act, authorized by Title V of the Colorado River Basin Project Act, <br />approved September 30, 1968, as modified by the Settlement Act, as amended. <br />(j ) "Project Construction Committee" means the committee made up of representatives of <br />thos ( entities that have been identified by the Settlement Act, as amended, to receive a water <br />alloc ttion and the Bureau of Reclamation. This committee has provided and will provide <br />coor ination and consultation on the construction activities among all the project beneficiaries, <br />seek ng common understanding and consensus on decisions associated with such items as final <br />plan for Project Works, project construction completion schedule, and Project construction <br />23 de <br />c) "Project Operator" means the Association operating the Project Works. <br />) "Project Water" means all water provided through the Animas -La Plata Project. <br />n) "Project Works" means all works or facilities as described in the Settlement Act, as <br />[ded, to be constructed under the Project, including a reservoir, a pumping plant, a reservoir <br />conduit, and appurtenant facilities with sufficient capacity to divert and store water from the <br />ias River for an average annual depletion of 57,100 acre -feet of water to be used for a <br />cipal and industrial water supply, together with lands and rights -of -way for such works, as <br />•ibed in Article 2 herein. <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.