Laserfiche WebLink
Animas -La Plata Project <br />Feb 13, 2013 Draft Transfer Inspection Report <br />TRANSFER ISSUE <br />STIPULATION <br />Water seeps into the <br />Reclamation will caulk both ends of the outlet works grouted <br />grouted riprap channel <br />riprap channel. <br />The two baffled outlet drain <br />Reclamation will install check or flapper valves on the two <br />pipes are open to debris <br />drainage pipes. <br />and rodents <br />1. 4'x 6' Guard Gate <br />One 4' x 6' guard gate is installed in the outlet works gate chamber. The gate is used as an <br />emergency /guard gate. The hydraulic power unit (HPU), located in the control house, is <br />used to control the gate from the auxiliary control panel (ACP) or from the gate chamber. <br />The guard gate consists of steel bodies that are embedded in concrete, a gate leaf, bonnet <br />cover, and oil- operated hydraulic hoist. The hydraulic hoist has a 16" diameter bore and a <br />6' -1" stroke. The guard gate is positioned either in the fully open or fully closed position. <br />The controls for the gate consist of a hydraulic power unit and connecting piping. The <br />hydraulic power unit consists of an oil reservoir, two motor -pump units, relief valve, <br />pressure switches, pressure gauge, two- and four -way valves, flow - control valve, check <br />valves, suction and pressure filters, accumulators, and other related equipment. <br />There is some water leakage between the bottom gate seat and concrete. This was <br />quantified and documented in the 2012 Comprehensive Review (CR). As a part of the Safety <br />of Dams Program, Reclamation will measure seepage flows during all future CR exams to <br />ensure that the rate remains within acceptable limits. <br />TRANSFER ISSUE <br />STIPULATION <br />There is seepage between <br />Reclamation will monitor guard gate seepage to ensure that it <br />the bottom gate seat and <br />remains within acceptable limits. <br />concrete invert <br />2. 66" Diameter Discharge Pipe <br />The 66" diameter steel pipe is located within the concrete lined outlet works tunnel. The <br />pipe terminates in the gate /valve room with a trifurcation into a 66" diameter steel pipe <br />controlled by a 60" jet flow gate; a 48" diameter steel pipe with a 48" butterfly valve, and <br />controlled by a 48" inline sleeve valve; and a 36" butterfly valve and blind flange. <br />During the 2012 CR, areas of corrosion were noted in the first pipe section downstream of <br />the guard gate. An area of pipe coating was found to be fractured above a dent in the <br />second discharge pipe section. <br />TRANSFER ISSUE <br />STIPULATION <br />There are rust spots and <br />Reclamation will repair all coating locations identified in the 2012 <br />coating damage in the <br />CR. <br />interior of the pipe <br />Transferred Works Inspection 5 Animas -La Plata Project <br />