My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
CWCB
>
ALP Project
>
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 12:28:57 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 2 — Explanatory Recitals <br />• Historical Background <br />• Reasons for Contract <br />Section 4 — Term of Contract <br />• Effective date of Contract <br />• Termination date <br />• Date of initial service <br />Section 6 — Firm Electric Service <br />• Delivery point(s) <br />• Delivery Voltage <br />• Measurement Point(s) <br />• Contract Rate of Delivery <br />— Maximum rate power can be taken (kW) <br />• Authorized Overruns <br />— Provides flexibility in in setting CROD <br />Section 3 — Agreement <br />• Parties agree to Contract <br />Section 5 - Definitions <br />• Defines terms used in Contract <br />• Summer Season —April through September <br />• Winter Season — October through March <br />• Runoff Period — Portion of Summer Season <br />that pumps are expected to run <br />• Non -Runoff Period — Portion of Summer and <br />Winter Season when pumps are not running <br />• Billed on Runoff and Non -Runoff Allocations <br />Section 6 (Cont) <br />• Runoff Period Allocation <br />• Non -Runoff Period Allocation <br />• Authorized Overruns <br />7/6/2010 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.