Laserfiche WebLink
H4 <br />Contract No. 09 -SLC -0645 <br />Animas -La Plata Operation, <br />Maintenance, and Replacement <br />Association <br />Exhibit A <br />Page 1 of 1 <br />Exhibit A <br />Rates of Delivery, Designated Points of Delivery, Voltages, Points of Measurement, and Voltages <br />Refer to Article (5) <br />This Exhibit A, made this day of 20_, to be effective under and as a part of Contract No. 09 -SLC -0645, dated , 20 , hereinafter called Contract, <br />shall become effective on the date of initial service under this Contract and shall remain in effect until superseded by another Exhibit A; Provided, that this Exhibit A or any <br />superseding Exhibit A shall be terminated by the termination of this Contract. <br />Other Priority Use <br />Summer <br />Winter <br />Contract Rate of Delivery Season <br />Season <br />kW <br />(kW) <br />18,200 <br />13,000 <br />Runoff Period Allocation (May I" through June 30th) <br />Utilization <br />Metering <br />Runoff <br />Points(s) Nominal <br />Nominal <br />Period Transformation Losses <br />Of Voltage Points(s) of <br />Voltage <br />Allocation Between Metering point <br />Utilization (kV) Measurement & Delivery <br />(kV) <br />(kW) and Point of Delivery <br />Durango Pumping Plant 6.9kV 115kV Durango Substation 115kV 1000 None <br />Based on running one <br />1250 hp <br />Non- Runoff Period Allocation (July 1st through April 301h) <br />Utilization <br />Metering <br />Non -Runoff <br />Points(s) Nominal <br />Nominal <br />Period Transformation Losses <br />Of Voltage Points(s) of <br />Voltage <br />Allocation Between Metering point <br />Utilization (kV) Measurement & Delivery <br />(kV) <br />(kW) and Point of Delivery <br />Durango Pumping Plant <br />6.9kV 115kV Durango Substation 115kV <br />80 <br />None <br />Billing: Pursuant to Section 6.4 of the Contract, the Animas -La Plata Operation, Maintenance, and Replacement Association will be billed monthly on the Runoff Period <br />Allocation or Non -Runoff Period Allocation and the actual energy used in each month of the Runoff Period and Non -Runoff Period respectively. <br />Periodic Short-Term Pumping: Pursuant to Section 8 of the Contract, the Contractor may periodically arrange for short term purchases. The cost of these purchases will be <br />included in the bill for the month in which the purchases are made. <br />