My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Supply and Demand Study 1/13/11
CWCB
>
ALP Project
>
Water Supply and Demand Study 1/13/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 11:22:24 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Water Marketing Supply and Demand Study <br />APPENDIX A <br />UPDATED CAPITAL COST DATA <br />The sources of the data in Table 2.2, Capital Costs for A -LP Project are: <br />• The September 2009 capital cost data are from Patrick Page, U.S. Bureau of Reclamation. <br />See further documentation in Note 1, Appendix B in Animas -La Plata Project Water Supply <br />and Demand Study, Brown and Caldwell, February, 24, 2010. <br />• The July 2010 capital cost data are from the Bureau of Reclamation July 7, 2010 A -LP <br />Workshop, Durango, Colorado. <br />• The October 2010 updated capital cost data are from an October 7, 2010, email to Leo Eisel <br />from Pat Page, U. S. Bureau of Reclamation. <br />Appendix B in the first report on the A -LP project (Brown and Caldwell, February 24, 2010) provides <br />further information concerning: the basis for the 40 -year repayment period and the basis for <br />calculation of Interest During Construction (IDC). <br />A -1 <br />Appendix A final 1_13_11.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.