Laserfiche WebLink
Anima+La Plata Water Marketing Supply and Demand Study Section 2 <br />in the 2000 Amendments, it is estimated that Colorado's Fixed OM &R Costs at startup would be $9,760 <br />per year, as shown in Table 2.4 "Minimum Allocation." Fixed OM &R will be assessed annually and must <br />be pa d in advance of the water year. The State should confirm these values with the Association prior to <br />becor iing a member of the Association. <br />Emergency Reserve Fund (A Component of Fixed OM &R Costs) <br />The c 31culation of Fixed OM &R Costs includes the establishment of an Emergency Reserve Fund and a <br />Reple cement Reserve Fund. Section 17 of the OM &R Contract calls for the Association to establish an <br />Emer 1,ency Reserve Fund with annual deposits by the Association of not less than $60,000 per year until <br />the E ergency Reserve Fund contains $700,000 (April 2009 dollars) during initial stages of Project <br />operE tion and $1,400,000 (April 2009 dollars) once the Project is under full operation. Since the <br />Emer ency Reserve Fund is part of the Association's Fixed OM &R costs, Colorado's contribution is <br />alrea y included in that cost. The size of the Emergency Reserve may be adjusted upon mutual <br />agreE ment between the Association and the United States. The Emergency Reserve Fund is to be used <br />to "cover costs incurred during periods of special stress caused by damaging droughts, storms, <br />earth juakes, floods or other emergencies causing interruption of water service." The Emergency <br />Rese ve Fund shall be available for use by the United States during any period in which any of the <br />Tram ferred Works are operated or maintained by the United States, which will be defined in the Transfer <br />of Fa ilities document to be prepared following Substantial Completion of the Project. <br />Repli icement Reserve Fund (A Component of Fixed OM &R Costs) <br />Fixed OM &R costs also include a Replacement Reserve Fund, as described in Section 7 of the OM &R <br />Conti act. Payments of $45,000 annually by the Association will be placed into the fund to ensure there <br />area Jequate funds available to replace A -LP Project facilities and equipment when necessary. There is <br />no id ntified ceiling for this fund in the OM &R Contract, IGA or IGA Exhibit A. It will be up to the <br />Asso iation, in consultation with Reclamation, to identify a cap amount. <br />Vari bie OM &R Costs <br />Varia le OM &R Costs are defined in Section 8.03 of IGA Exhibit A as "the costs of power including energy <br />cons mption and that share of power demand for pumping water not designated as Fixed OM &R costs." <br />The Variable OM &R Costs are the electrical costs for pumping water. There are several factors to <br />cons der in determining these pumping costs. <br />Ener Consumption is defined as the amount of energy used to run the A -LP Project pumps. It is <br />typic lly measured in kilowatt hours. Power Demand (aka Capacity) is defined as the demand for energy <br />and i split into three basic acquisition categories: Baseload, Intermediate and Peaking. Each Project <br />parti ipant shall be responsible for the annual payment of the Variable OM &R Costs associated with the <br />deliv ry of its A -LP Project water that are not covered by the Variable OM &R Fund described below. <br />Each Project participant shall be assessed its share of projected Variable OM &R Costs at least once a <br />year and shall pay such charges within a reasonable time period in advance each year. Project <br />parti ipants are required to advise the Association Management Committee of their anticipated annual, <br />mon hly and daily water demands in advance of actual use each year, with the understanding that there <br />can I ie changes to these orders from time to time. <br />Power for the Project is provided by the Colorado River Storage Project in accord with terms in the 1956 <br />Colo ado River Storage Project Act. Power operations are managed by the Western Area Power <br />Adm istration (WAPA). WAPA sets the "Firm Electric Service Rate," which is reviewed annually and <br />cha ed if necessary. The rates currently in effect October 1, 2009 are as follows: <br />Demand or Capacity Charge: $5.18 /kilowatt of billing demand <br />2-8 <br />HNAL 4-P Report_1_13_11_LL.Docx <br />