My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 7
CWCB
>
ALP Project
>
ALP 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 10:52:35 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I (b) he Project Operations Committee consisted of representatives from those entities that <br />2 were idei tified by the Settlement Act, as amended, to receive a water allocation and the Bureau <br />3 of Recla ation. This committee determined an appropriate entity to contract with Reclamation <br />4 for the o eration, maintenance, and replacement (OM &R) of the Project Works :and developed a <br />5 commol understanding among the project beneficiaries of the appropriate level of annual <br />6 OM &R ictivities to be performed on the Project Works to assure the Project's long term <br />7 operati al integrity and public safety. This committee was essentially replaced by the <br />8 Assock Lion who subsequently entered into an OM &R contract with Reclamation. Ultimately, <br />9 the Ass ciation will oversee the ongoing OM &R activities of the Project Works, providing <br />10 consul tion and coordination among Association members on such items as annual OM &R <br />1 l fundin , maintenance schedules, and public safety issues. <br />12 <br />13 4. MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION OF STATUTORY <br />14 WATER ALLOCATION <br />15 (a The water released or bypassed for the State pursuant to this contract shall be measured <br />16 at the utlet works of Ridges Basin Dam, and /or in the Animas River at the Durango Pumping <br />17 Plant ith measuring facilities installed by the United States as a part of the Project. Additional <br />18 point of diversion directly from Lake Nighthorse may be made in the future by the State after <br />19 cons ltation and approval of the United States. Water delivered at these additional points of <br />20 divei sion on Lake Nighthorse shall be measured at those points of diversion by facilities <br />21 provpded by the State or its subcontractors. Water will be available at the outlet works of Ridges <br />22 <br />23 <br />Dam and /or the Animas River in such quantities as the State determines, subject to <br />ty limitations of the relevant facilities, to ensure that the State annually; receives a <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.