My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 5
CWCB
>
ALP Project
>
ALP 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:03 PM
Creation date
3/28/2013 4:08:26 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
37 60 123.2. Flood AND DROUGHT response fund created. There is hereby ereat <br />in the oauw u y fund". w .. J u „vvu AND , referfed to in this seetion as <br />"response <br />thousand dollars &am the ColeFade watef eensen,ation board eonstmetien fund to the response <br />fund. The board is aut-herized to provide funding for flee,! AND DROUGHT prepafe&ess an <br />meneys in the response fund are her-eby eentinuously appr-epriated to the board f6f flood AND <br />for- aerial phetegmphy ef flood areas, flood AND DROUGHT deeumentatien and identifleatien e <br />speeifie hazards, evaluations and r-eyisions of fleedplains designatiens, A�� DROUGHT PRONE <br />AREAS, flood AND DROUG14T for-eeasting and preparation, and development of disaster a <br />fund shall be eredited to the Color-ado wateF eefiservation board eenstruetion fund. Any balanee <br />remaining in the response fund at the end of any fiseal year shall remain in the I <br />SECTION 6. Wo gran_ development project — appropriation. (1) In <br />addition to any other appropriation, there is hereby appropriated, out of any moneys in the <br />Colorado water conservation board construction fund account not otherwise appropriated, to the <br />department of natural resources, for allocation to the Colorado water conservation board, for the <br />fiscal year beginning July 1, 2013, the sum of two hundred fifteen thousand dollars ($215,000), or <br />so much thereof as may be necessary, for the board to improve forecasting of water supplies in the <br />rio grand river basin. <br />(2) The moneys appropriated in subsection (1) of this section shall remain available for the <br />designated purposes until they are fully expended. <br />SECTION 7. system operations and maintenance — <br />appropriation. (1) In addition to any other appropriation, there is hereby appropriated, out of any <br />moneys in the Colorado water conservation board construction fund account not otherwise <br />appropriated, to the department of natural resources, for allocation to the Colorado water <br />conservation board, for the fiscal year beginning July 1, 2013, the sum of one hundred thousand <br />dollars ($100,000), or so much thereof as may be necessary, to fund the operation and maintenance <br />of the board's CDSS investment. <br />(2) The moneys appropriated in subsection (1) of this section shall remain available for the <br />designated purposes until the project is completed. <br />SECTION 8. — appropriation. (1) In <br />addition to any other appropriation, there is hereby appropriated, out of any moneys in the <br />Colorado water conservation board construction fund account not otherwise appropriated, to the <br />department of natural resources, for allocation to the Colorado water conservation board, for the <br />fiscal year beginning July 1, 2013, the sum of seventy five thousand dollars ($75,000), or so much <br />thereof as may be necessary, to perform feasibility study work associated with options that may <br />help bridge the supply /demand imbalance and assure that Colorado can participate in <br />implementation of the Colorado river basin study. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.