My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 4
CWCB
>
ALP Project
>
ALP 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:01 PM
Creation date
3/28/2013 3:28:07 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Operation, Maintenance and Replacement <br />Association <br />October 25, 2012 <br />Barry Longwell <br />Construction Engineer <br />Four Corners Construction Office <br />103 Everett Street <br />Durango, CO 81303 <br />Subject: DPP Pumping Capacity <br />Dear Barry, <br />The Association has been meeting with the Colorado Department of Water Resources <br />and the Southwestern Water Conservation District to develop a Draft Protocol for <br />administration of the Animas -La Plata Project water rights. The Draft Protocol contains <br />language that describes the anticipated maximum capacity of the Durango Pumping <br />Plant as being 280 cfs and the actual capacity will be determined through testing of the <br />facilities before Project O &M is transferred by Reclamation to the ALPOM &R <br />Association. <br />In order to accurately determine the actual capacity of the Durango Pumping Plant the <br />Association requests arrangements be made, when an opportunity presents itself, to run <br />all eight units simultaneously. We realize there may be limiting factors in accomplishing <br />this task; however, we all know the actual capacity of the Plant is something greater <br />than 280 cfs. The information gained from this test will allow Reclamation and the <br />Association to make more of the ALP diversion right absolute. <br />As you may recall, the Association negotiated a contract with WAPA that allows <br />Reclamation and the Association to schedule power ahead of time for the purposes of <br />testing without incurring the monthly demand charge. <br />If you have any questions about our request please don't hesitate to call me. <br />Sincerely, <br />Russell Howard <br />General Manager, ALPOM &R Association <br />125 Smelter Place Durango CO 81303 PH: 970.385.7140 FX: 970.385.7158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.