My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5-90CW308 Final Decree + Stips
CWCB
>
Instream Flow Appropriations
>
DayForward
>
2001-3000
>
5-90CW308 Final Decree + Stips
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2016 11:33:43 PM
Creation date
3/27/2013 12:09:34 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
90CW0308
Stream Name
Fraser River
Water Division
5
Instream Flow App - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. The CWCB's Instream Flow water right described <br />above in paragraph 3 shall not constitute a basis <br />for modification of the bypasses, required of <br />Englewood under the Englewood -USrS Stipulation. <br />CONCLUSIONS OF LAW <br />5. Jurisdiction: The Rte. :ree has jurisdiction over <br />this proceeding. The CWCB has complied with the required <br />statutory requirements, full and adequate notice of CWCB's <br />claims have been given in the manner required by law and no <br />additional notice needs to be given. The Court has <br />jurisdiction over the subject matter and over all persons with <br />standing to become parties in this case, whether they have <br />appeared or not. <br />6. Incorporation of Findings of Fact: The foregoing <br />findings of fact are incorporated herein to the extent that <br />they constitute conclusions of law. <br />7. Standards and Burdens of Proof: The CWCB has <br />complied with all requirements, has met all standards and <br />burdens of proof regarding the Board's appropriation of the <br />Instream Flow water rights requested in the Application filed <br />in this case, and is therefore entitled to a Ruling confirming <br />and approving its Instream Flow water rights as more fully <br />described in paragraph 3 above. <br />JUDGMENT AND DECREE <br />I 8. Incorporation of Findings of Fact and Conclusion of <br />Law: The roregoing F111dings 01' Fact and Co cl of La, -: <br />are approved and incorporated herein by reference. <br />9. Water Rights Decreed: The Referee Rules and Orders <br />that subject to the terms and conditions set forth herein, the <br />,subject Application is granted and -he following lnstr am Flow <br />water right is hereby ordered, adjudged and decreed: <br />30.0 c.f.s. ABS01 -1 :E , April 15 - September 30); <br />19.0 c.f.s. ABSOiJTz' ;October 1 - April 14). <br />for the purpose of maintaining an Instream Flow to <br />preserve the natural environment to a reasonable <br />degree in the Fraser River between the upstream and <br />downstream termini as described above in paragraph <br />3 with an appropriation date of ..,vember 27, 1990. <br />The priority herein awarded was filed ".he Water Court <br />in the year of 1990 and shall be junior all priorities <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.