Laserfiche WebLink
Slattery & Hendrix Engineering LLC <br />Emergency, drought - related engineering tasks, 2012 <br />Task <br />Dates <br />Cost <br />Re- evaluated pumping allocation and prepared <br />5/1/2012— <br />$1,147.50 <br />report to be submitted to Division Engineer's office <br />5/8/2012 <br />with LAWMA's response to drought yields of its <br />water rights <br />Prepared amendment to LAWMA's replacement <br />5/11/2012 — <br />$2,565.00 <br />plans to reduce pumping allocation due to drought <br />5/23/2012 <br />conditions. <br />Prepared revised allocation notices to LAWMA <br />6/6/2012— <br />$1,080.00 <br />members with reduced pumping allocations based <br />6/8/2012 <br />on reduction in water right yield projections <br />TOTAL <br />1 <br />1$4,792.50 <br />As the attached budget materials show, LAWMA operates on a tight annual budget, which <br />reflects LAWMA's members' ability to pay for water. The financial effects of the drought <br />already are being felt in the Lower Arkansas Valley, and those effects are compounded by the <br />current economic environment. <br />If approved, this grant request will allow LAWMA to buffer the increase in our members' costs <br />for irrigation water at a time when they already are struggling economically, by using 100% of <br />the grant of $326,800 to reimburse, pro -rata, those LAWMA members who leased the <br />emergency replacement water that LAWMA acquired from the Pueblo Board of Water Works. <br />