My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Feasibility Study I
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150349 Feasibility Study I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:35:42 AM
Creation date
3/26/2013 2:13:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Description of Project <br />This project completes a waterline that will provide water to the Ordway Cattle Feeders feedlot from wells <br />located on a local ranch owned by the company. The wells are decreed for irrigation and livestock watering. <br />The Ordway Cattle Feeders already has in place a battery of four wells, two booster stations and 4.2 miles of <br />pipe at the west end of the proposed system. Phase I, funded by Ordway Cattle Feeders in its entirety, <br />includes re- establishing easements and the rehabilitation of the existing stretch of pipeline, wells and booster <br />stations. Phase 2 completes the project with a third booster station, 10.5 miles of water pipeline, two back -up <br />generators, and a remote monitoring and control system. <br />Purpose and Need <br />The primary purpose of this project is to provide a consistent, viable supply of livestock drinking water, dust <br />abatement, and compost conditioning water for the Feedyard. The Feedyard also intends to use this new <br />water source to serve their feed mill in the future. In addition, the water supply will also provide an <br />emergency source of water for fighting farmstead and wild land fires in the area from Crowley to Ordway. <br />Facilities <br />• 10.5 miles of 15" diameter water pipeline <br />• 2 highway crossings bored, with 24" casings <br />• 10 fire hydrants <br />• Booster Station C <br />• 2 Back -up generators for booster stations <br />• Remote monitoring and control system <br />Water Uses to be Served <br />• Livestock drinking water <br />• Dust abatement <br />• Compost conditioning water <br />• Feed mill <br />• Office Use <br />• Emergency Firefighting <br />Service Area <br />• The project serves Ordway Feedyard and rural Crowley County between River Ranch and the <br />feedlot. <br />6. Will the acquisition of additional water rights be necessary? NO <br />7. Engineer: Kidd Engineering and Construction Management Services, Inc. <br />44811 East US Highway 50 <br />Avondale, CO 81022 <br />(719) 544 -5239 <br />kiddecros @earthlink.net <br />Attorney: Wendy Shinn <br />Shinn, Steerman & Shinn <br />200 West Elm Street <br />Lamar, CO 81052 <br />(719) 336 -4313 <br />wss-sss@centurytel.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.