My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Feasibility Study I
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150349 Feasibility Study I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:35:42 AM
Creation date
3/26/2013 2:13:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDWAY FEEDYARD WATER LINE EXTENSION <br />PROJECT FUNDING SUMMARY <br />Ordway Cattle Feeders Matching Funds <br />Phase 1: Rehab <br />ab of existing 4.3 mile pipeline -spent to -date 453,000 <br />Phase 1: Rehab of existing 4.3 mile pipeline -to come 125,000 <br />Phase 1: Re- establish easements for existing line 6,000 <br />Phase 1: Preliminary Design 14,904 <br />PHASE I COST: 601,404 <br />PHASE II COST: 2,780,000 <br />TOTAL PROJECT COST: 3,381,404 <br />Loan to Project ratio: 74% <br />Loan to Grant ratio: 9:1 <br />Cash Match & Basin Funds to Statewide Funds (must be 20 %): 74% <br />Basin Funds must be at least 5% of total grant amount: 18% <br />Conclusions <br />Funding by a combination of WSRA Grants and CWCB Loan ensures the financial viability of this project, <br />and also ensures that much - needed repairs will be constructed in a timely manner, further ensuring the <br />long -term sustainability of the company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.