My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 Final Report
CWCB
>
Grants
>
DayForward
>
C150227 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:43:05 AM
Creation date
3/26/2013 1:12:58 PM
Metadata
Fields
Template:
Grants
Applicant
South Platte Ditch Company
Grant Type
Non-Reimbursable
Fiscal Year (i.e. 2008)
2006
Project Name
Canal Modernization and Radio Telemetry Demonstration Project
CWCB Section
Finance
Contract/PO #
C150227
Grants - Doc Type
Final Deliverables
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
download accumulated logged data values. Retrieved data is then stored on the computer <br />hard drive in an Excel compatible .csv data file. <br />CDI units were installed on the SPDC recharge system at the two sites where the CFM <br />units had previously been located. Figure 1 shows the installation at the original G2 <br />flume. This site marks the beginning of the reach of the Sandhill ditch for which SPDC <br />receives recharge credit for canal seepage losses. Figure 2 shows the Sandhill pond <br />installation. <br />Figure 1. 2005 Photo of the SPDC G2 Flume <br />
The URL can be used to link to this page
Your browser does not support the video tag.