My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150337 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150337 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2015 2:17:17 PM
Creation date
3/26/2013 12:30:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-060
C150337
Contractor Name
Well Augmentation System of the Central Colorado Water Conservancy District
Contract Type
Loan
County
Weld
Adams
Morgan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prior to bidding. Any modifications to the plans and specifications must be <br />approved in writing by the CWCB staff. <br />E. For plans and specifications for all jurisdictional dams and reservoirs, as defined' <br />by § 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />F. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />G. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by the CWCB staff. <br />H. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verges that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />I. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />J. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />K. The BORROWER shall construct the PROJECT in accordance with the approved <br />plans and specifications. <br />L. Upon completion of the PROJECT construction, the BORROWER shall provide as -built <br />drawings of the PROJECT to the CWCB staff, or, if required by § 37 -87 -105, C.R.S., <br />the BORROWER shall provide the as -built drawings to the State Engineer's Office for <br />approval and filing. <br />M. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />SECTION 8 — ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Engineering associated with the feasibility report prepared as a requirement for <br />this loan and associated with evaluating the suitability of the water rights for <br />purchase by the BORROWER. <br />B. Interest during completion of the PROJECT pursuant to Paragraph A.4 herein. <br />C. Legal services for reviewing engineering services contracts and this Contract. <br />Appendix 1 to Loan Contract C150337 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.