My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150342 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150342 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:12:54 PM
Creation date
3/26/2013 12:28:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-012
C150342
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
Water District
24
County
Costilla
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY — Sanchez Ditch and Reservoir Company <br />Contract No. C150342 <br />SECTION 1 — BORROWER INFORMATION <br />Name: Sanchez Ditch and Reservoir Company <br />Address: PO Box 215, San Acacia, CO 81150 <br />Contact:Jerry Lorenz (President) and Travis Robinson (Manager) <br />Phone Number: 719 - 588 -6385 <br />E -mail address: sanchezditch @gojade.org <br />Type of Entity: a Colorado nonprofit corporation <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan of up to <br />$1,117,600 to be used for the construction of the Sanchez Reservoir Outlet <br />Rehabilitation Project located in Costilla County, hereinafter referred to as the <br />PROJECT. The total cost of the PROJECT is estimated to be $2,032,000. The <br />purpose of the Project is to address the safety and operational management <br />concerns at the reservoir by demolishing the gate tower and modifying the outlet <br />works. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PROJECT entitled "Feasibility Study for Sanchez Reservoir Outlet <br />Rehabilitation Plan" dated July 2012, prepared by Duane Smith, P.E. of Smith <br />Geotechnical which is incorporated herein by reference and based upon the <br />feasibility report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Construction Fund. This loan is made pursuant to the provisions of §§ 37 -60 -119 <br />and 37 -60 -120, C.R.S., which authorize the CWCB to loan money for water projects <br />from the CWCB Construction Fund for the benefit of the people of the state, <br />provided that the borrower assures repayment of that money. <br />Section 37- 60- 122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax <br />Trust Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION <br />At its September 2012 meeting the CWCB approved a Small Project Loan from the <br />Construction Fund, to the BORROWER, in an amount up to $1,117,600 for PROJECT costs <br />not to exceed 90% of the cost of the PROJECT, with a loan origination fee of 1 % in <br />accordance with CWCB Policy No. 16 resulting in a total loan amount of $1,128,776. <br />The repayment term of the loan shall be thirty (30) years at an interest rate of 1.75% per <br />annum, the first 5 years of which are interest only. Principal and interest would be <br />paid over the remaining twenty five (25) years. <br />Appendix 1 to Loan Contract C150342 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.