My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153618 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153618 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 11:22:24 AM
Creation date
3/19/2013 10:10:02 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153618
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
general liability insurance covering the management, operation, <br />and maintenance of the project until it completes repayment to the <br />State in at least the following amounts: <br />a. For any injury to one person in any single occurrence, <br />the sum of One Hundred Fifty Thousand Dollars ($150,000). <br />b. For any injury to two or more persons in any single <br />occurrence, the sum of Four Hundred Thousand Dollars <br />($400,000). <br />c. For any damage to property, the sum of Four Hundred <br />Thousand Dollars ($400,000) for each occurrence. <br />Said liability coverage shall be maintained through the <br />Contractor's self- insurance program. A copy of the ordinance <br />creating the Contractor's self - insurance program and a letter of <br />credit creating a reserve for the program are attached and made a <br />part hereof as Exhibit A. <br />8. Make the services of said project available within its <br />capacity and in accordance with its rules and regulations,- and <br />operational guidelines, to all persons in the Contractor's service <br />area without discrimination as to race, color, religion, or <br />national origin at reasonable charges (including assessments, <br />taxes, or fees), whether for one or more classes of service, in <br />accordance with a schedule of such charges formally adopted by the <br />Contractor through its City Council, as may be modified from time <br />to time. The Contractor hereby states and ffirms that the rate <br />schedule adopted by the Water and Sewer B and the City Council <br />in accordance with the Charter of the Ci'L`, Gr must and <br />shall provide for the generation of sid', nt e ' es for: (1) <br />the operation and maintenance of the!w��eor sx�n. � ( 2 ) debt <br />service requirements including repay m n 0 -- .ttelproject loan <br />authorized by this contract; and (3) add* obi o a reserve <br />account to offset depreciation to the wl'ter,.system. The <br />Contractor may make such modification'to the rate schedule as the <br />Contractor deems necessary to efficiently and economically provide <br />for the financial requirements of the system. The rate schedule <br />shall remain reasonable and non - discriminatory. <br />9. Adjust its operating costs and service charges at the <br />request of the State to provide for adequate operation and <br />maintenance, emergency repair services, obsolescence reserves, and <br />debt reserves and to assure repayment pursuant to this contract. <br />10. Provide the State with such periodic reports as the <br />State may require and permit periodic inspections of its <br />operations and accounts by a designated representative of the <br />State. <br />11. Repay to the State the total sum of Six Hundred Seventy - <br />Four Thousand Twenty -Five Dollars ($674,025), which includes the <br />project loan amount and the Twenty- Three - Thousand- Six- Hundred- <br />Forty - Dollar ($23,640) feasibility report amount, (as shown in <br />Exhibit B, which is attached hereto and made a part hereof), <br />together with interest at five percent (5 %) per annum, said <br />repayment to be made in constant annual installments of Twenty -Six <br />Thousand Nine Hundred Sixty -One Dollars ($26,961) each for twenty - <br />five (25) years, as shown in Exhibit C, attached hereto and <br />incorporated by reference herein, which first installment shall be <br />due and payable on the first day of the month next succeeding the <br />month in which the State determines that the project has been <br />substantially completed, and yearly thereafter until the entire <br />principal sum shall have been paid. Said installment payments <br />shall be made payable to the Colorado Water Conservation Board, <br />payable at the offices of said Board in Denver, Colorado. <br />The Contractor pledges its full faith and credit in support <br />of this obligation and warrants that it shall lawfully adopt a <br />valid ordinance that recognizes this obligation pursuant to its <br />charter prior to the execution of this Contract. Such ordinance <br />Page 3 of 8 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.