Laserfiche WebLink
404um 6-A[AIZA <br />Peterson Dam <br />W /FRPB <br />PROJECT <br />CONTRACT' <br />4t' 1FNr OR AGENCY NAME. <br />WAR 1 MENTOR AUENCY NUMBER <br />PDA <br />ROUTING NUMBER <br />37115 COKMCP, made this day of 199 2 , by and between the State of Colorado for <br />the use and bencrit of the Depad meni of Natural R our e s <br />(Colorado Water Conserva <br />, , l:. OR <br />hereinafter refereed to as the State, and the City of Greeley, `b 'r VA ° <br />41 10 <br />Greeley Civic Center Greeley, CO 80631 <br />hcreinflcr referred to as the contractor /Contractor. f _ p f ,r%'' , <br />WIIBRIAS, authority exists in the Law and Punds have been budgeted, appropriated and oth&tisfti%¢lc and a <br />sufficient unencumbered balance thereof remains available for payment in Pund Number " 462 . App <br />Organivation YYYX � p... WTRC Cwlract Pncumbrance Number, Cl (p Q ; and <br />W1111REAS, required approval, clearance and coordination have been aocompliched from and with appropriate agencies; and <br />WHEREAS, pursuant to the provisions of 37 -60 -119, Colorado <br />Revised Statutes, the State is authorized to loan money for the <br />construction of water projects for the benefit of the people of <br />the State; and <br />WHEREAS, the Contractor is a duly constituted Home Rule City <br />in the State of Colorado and wishes to construct, or cause to be <br />constructed, the enlargement and rehabilitation of its Peterson <br />Dam and appurtenant structures, hereinafter called the project, <br />which is located in Larimer County, Colorado at an estimated cost <br />of Seven Hundred Sixty Thousand Dollars 000); and <br />WHEREAS, the State participate' as <br />investigation of said project, and i'w fo t, such a <br />project is technically and financially fe ,1'The feasibility <br />report contract has been amended to ing, e ;tb ayment of the <br />State's share of the feasibility rep, „?!I, "ch relates to the <br />rehabilitation of Peterson Reservoir wl "-fi repayment of this <br />project loan; and <br />WHEREAS, the State has now agreed to loan money for the <br />construction of said project upon mutually agreeable terms and <br />conditions, subject to the availability of funding for that <br />purpose; and <br />WHEREAS, pursuant to Senate Bill No. 15, Fifty -Sixth General <br />Assembly of the State of Colorado, duly enacted into law, the <br />State has been authorized to loan a sum not to exceed Three <br />Hundred Eighty Thousand Dollars ($380,000) for the feasibility <br />report and the construction of the'project; <br />WHEREAS, the Contractor desires to include the repayment of <br />the sum of Twenty -Three Thousand Six Hundred Forty Dollars <br />($23,640), previously advanced by the State for the feasibility <br />study of Peterson Dam, in its repayment of the loan of Three <br />Hundred Fifty -Six Thousand Three Hundred Sixty Dollars ($356,360) <br />made under this contract for a total principal repayment of Three <br />Hundred Eighty Thousand Dollars ($380,000); <br />NOW, THEREFORE, in consideration of the mutual and dependent <br />covenants herein contained, it is agreed by the parties hereto as <br />follows: <br />A. The Contractor agrees that it shall: <br />1. Employ an engineering firm to prepare project plans and <br />specifications for the project. Both the engineering firm and the <br />project plans and specifications must be approved by the State <br />before initiation of construction on the project, including any <br />real estate and water rights acquisitions, can commence. <br />cWCV s /91 <br />Page 1 of R pages <br />bj290a.k <br />dr0011con <br />