My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153618 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153618 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 11:22:24 AM
Creation date
3/19/2013 10:10:02 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153618
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 87-15
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OR AGENCY NAME <br />Water Conservation Board <br />DEPARTMENT OR AGENCY NUMBER <br />PDA <br />ROUTING NUMBER <br />CONTRACT AMENDMENT #1 <br />THIS AMENDMENT, made this day of ween the State of Colorado <br />De artment of Natural RYsources Color rvation Board (CWCB), <br />for the use and benefit of the p , <br />hereinafter referred to as the STATE, and the CITY OF GREELEY, Greele 'v �. e ey, Colorado 80631, <br />hereinafter referred to as the CONTRACTOR. <br />RECITALS '�4� •�q ��1� <br />1. Authority exists in the law, and funds have been budgeted, appropriated, and of e available and <br />a sufficient unencumbered balance thereof remains available for payment in Fund Number ropriation Code <br />362, Contract Encumbrance Number C153618; and . <br />2. Required approval, clearance, and coordination has been aceomplished from and with appropriate agencies; <br />and <br />3. The STATE and the CONTRACTOR entered into a contract <br />93070, Contract Encumbrance Number C153618, hereinafter refE <br />agreed to loan money in the total amount of $380,000 ($354,3601 <br />report contract) to the CONTRACTOR to be used for enlargement an <br />agreed to repay the loan in accordance with the terms of the O <br />4. Paragraph A.2 of the ORIGINAL CONTRACT states that the i <br />and one -half (2 1/2) years from the date of the ORIGINAL CONTRACT U <br />beyond the control of the CONTRACTOR; and <br />Contract Routing Number <br />JTRACT, wherein the STATE <br />and $23,640 for feasibility <br />Dam, and the CONTRACTOR <br />'ROJECT is to be within two <br />STATE due to circumstances <br />5. CONTRACTOR has supplied a letter dated June 9, 1994, attached hereto as Exhibit A and made a part hereof, <br />requesting an extension for the date of completion, and explaining the need and reason for the extension; and <br />6. The STATE has reviewed the situation and is satisfied that the CONTRACTOR's need for an extension of one <br />year is reasonable and necessary; and <br />7. The STATE and the CONTRACTOR agree to extend the time for completion of the ORIGINAL CONTRACT by one <br />(1) year to January 17, 1996; and <br />8. CONTRACTOR has supplied a letter dated August 25, 1994, with engineers construction cost estimate in the <br />amount of $1,241,193 attached hereto as Exhibit B and made a part hereof, requesting an adjustment in the amount <br />of the project construction loan from $356,360 to $620,596 based on the changes required by the final design; and <br />9. In accordance with Section 1, Chapter 32 of the 1987 Colorado Session Laws, the loan amounts may be the <br />amounts authorized, plus or minus such amounts as may be justified by reason of changes made in the plans for a <br />project if those changes are required by final engineering drawings and specifications, however, such loan shall not <br />exceed 50% of the total cost of constructing the project; and <br />10. The STATE has reviewed the letter and engineers construction cost estimate and has determined that there <br />is a valid reason for adjusting the amount of the loan to $620,596; and <br />CITY OF GREELEY Page 1 of 3 CONTRACT AMENDMENT #1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.