Laserfiche WebLink
Name of <br />Lienholder <br />1. CWCB (C153606,2/14/1992) <br />2. CWCB (C153332, 9/15/1980) <br />3. Farmers Home Admin. <br />SECTION 6 - COLLATERAL <br />Current <br />Annual <br />Lien on <br />Balance <br />Payment <br />Revenues <br />$361,835 <br />$26,310 <br />Yes <br />$1,499,395 <br />$96,162 <br />No <br />$26,445 <br />$4,407 <br />No. <br />The collateral provided for this loan, as evidenced by the executed Deed of Trust, in <br />the form attached as Appendix 5 and incorporated herein, shall be an undivided one <br />hundred percent (100 %) interest in the Terrace Reservoir and associated water rights <br />located in Conejos County, as more particularly described in the attached Deed of <br />Trust ( "Collateral "). <br />SECTION 7 - ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION 8 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT:: <br />B. The BORROWER's and the Engineering Consul"tanfi`� Agrp&gents and the plans and <br />specifications must be submitted to the C4: ;;'aaff.: #or;vecation of compliance <br />with the terms of this Contract when ava le 'prior,tt:t6i �dQ. Any modifications to <br />the plans and specifications must be approved in*r 0y the CWCB staff. <br />C. For plans and specifications for all jurisdictiorw -oa i "and reservoirs, as defined by <br />§ 37 -87 -105 C.R.S., the BORROWER shall pr `'11'' letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bid opening and must approve the award of the <br />construction contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this contract, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />G. The BORROWER shall conduct a pre - construction conference at which time the <br />CWCB staff shall have the opportunity to review and approve the construction <br />schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by <br />the CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans <br />