My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/6/A-005 Supplemental Data
CWCB
>
Instream Flow Appropriations
>
DayForward
>
2001-3000
>
10/6/A-005 Supplemental Data
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:30:36 AM
Creation date
3/11/2013 12:15:50 PM
Metadata
Fields
Template:
Instream Flow Appropriations
Case Number
10/6/A-005
Stream Name
Morrison Creek
Water Division
6
Instream Flow App - Doc Type
Supplemental Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 0 <br />7. Morrison Creek Canyon Tunnel <br />• Access to the diversion would be difficult. <br />• As this diversion point is below the confluence of Silver Creek and Morrison Creek, <br />this option would also have the potential sedimentation problem. <br />• An approximately 1.25 mile tunnel would be bored through the mountain. After the <br />tunnel, the diversion water would run down an open charnel. Likely the open <br />channel would need to be improved to handle the diversion water. <br />• No cost estimate has been established for this concept. <br />Appendix D <br />
The URL can be used to link to this page
Your browser does not support the video tag.