Laserfiche WebLink
• <br />diverted at Barr Camp is minimal, the instream flow appropriation is not expected to <br />impact this structure. <br />Additionally, there is an aqueduct that appears to cross the watershed near its confluence <br />with Cascade Creek. TU and CDOW recommend that the terminus for the proposed <br />instream flow right be above this aqueduct. <br />