Laserfiche WebLink
-�517y <br />� i5odgy <br />THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: Snowmass Water & <br />Sanitation District, acting by and through <br />its Water Activity Enterprise <br />By <br />David Spen , President <br />Attest <br />(CORPORATE <br />SEAL) <br />Farrell, <br />State of Colorado <br />Bill Ritter, Jr., Governor <br />By <br />For the Execu ive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Jennifer L. Gimbel, Director <br />a <br />orm <br />Manager <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24 -30 -202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods <br />and /or services provided. <br />David J. McDermott, CPA, State Controller <br />By C <br />Effective Date /6/3-62 <br />Loan Contract C150294 <br />Page 11 of 11 <br />