My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Analysis of Colorado-Big Thompson Project Operation With Respect to East Slope Diversions and Non-Charge Deliveries
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2013 4:58:00 PM
Creation date
3/6/2013 3:29:32 PM
Metadata
Fields
Template:
Water Supply Protection
Description
For the River Colorado Water Conservancy District
State
CO
Basin
South Platte
Colorado Mainstem
Water Division
1
Date
10/1/2000
Author
Helton & Williamsen, P.C.
Title
Analysis of Colorado-Big Thompson Project Operation with Respect to East Slope Diversions and Non-charge Deliveries
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTENTS <br />EXECUTIVESUMMARY .............................................................................. ..............................1 <br />INTRODUCTION.......................................................................................... ..............................4 <br />PROJECTBACKGROUND .......................................................................... ..............................5 <br />EastSlope Facilities .............................................................................. ..............................5 <br />EastSlope Water Rights ....................................................................... ..............................7 <br />HistoricalOperation ............................................................................... ..............................7 <br />DIVERTIBLE BIG THOMPSON RIVER WATER ......................................... .............................10 <br />OPERATION OF EAST SLOPE FACILITIES TO MAINTAIN HISTORICAL C -BT YIELD........ 13 <br />WESTSLOPE EFFECTS ............................................................................ .............................15 <br />CONCLUSIONS.......................................................................................... .............................17 <br />Tables <br />(following text) <br />Title <br />1 <br />Pertinent Data Summarizing the C -BT Project's East Slope Water Rights <br />2 <br />Alva B. Adams Tunnel at East Portal <br />3 -A <br />End -of -Month Contents — Carter Lake <br />3 -B <br />End -of -Month Contents — Horsetooth Reservoir <br />3 -C <br />End -of -Month Contents — Carter Lake and Horsetooth Reservoir Combined <br />4 <br />Water Delivered to C -BT Project Users <br />5 <br />Non - Charge Water Delivered to C -BT Project Users <br />6 <br />Annual Summary of C -BT's Big Thompson River Operations <br />7 <br />Native Water That Was Excess to Existing Water Rights and Potentially <br />Divertible by the C -BT Project <br />8 <br />Native Water That Could Have Been Diverted into the Olympus Tunnel <br />9 <br />Additional Native Water That Could Have Been Diverted into the Dille <br />Tunnel <br />10 <br />Native Water That Could Have Been Diverted into the Olympus and Dille <br />Tunnels <br />11 <br />Derivation of Undiverted Non - Charge Water — Big Thompson River <br />12 <br />Historical and Simulated Adams Tunnel Diversions — Water Years 1983- <br />1998 <br />13 <br />Effects of Increased East Slope Diversions and the Non - Charge Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.