Laserfiche WebLink
1 <br />I <br />r <br />E <br />1 <br />1 <br />1 <br />� t' <br />i <br />ANALYSIS OF COLORADO -BIG THOMPSON <br />PROJECT OPERATION WITH RESPECT TO EAST SLOPE <br />DIVERSIONS AND NON - CHARGE DELIVERIES <br />FOR THE <br />COLORADO RIVER WATER CONSERVATION DISTRICT <br />October 2000 <br />HELTON & WILLIAMSEN, P.C. <br />CONSULTING ENGINEERS IN WATER RESOURCES <br />384 Inverness Drive South, Suite 144 <br />Englewood, Colorado 80112 -5822 <br />