My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pallid Sturgeon Recovery Plan
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Pallid Sturgeon Recovery Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2013 4:34:02 PM
Creation date
3/6/2013 2:34:12 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP),
State
NE
Basin
South Platte
Water Division
1
Date
11/7/1993
Author
Pallid Sturgeon Recovery Team, U.S. Fish and Wildlife Service
Title
Recovery Plan for the Pallid Sturgeon (Scaphirhynchus albus)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PALLID STURGEON <br />RECOVERY PLAN IMPLEMENTATION SCHEDULE <br />TASK PARTICIPATING OR <br />PRIOR- DURA- RESPONSIBLE PARTY <br />TION FWS OTHER COST ESTIMATES ($000) <br />ITY TASK A ,e.,..; a FY94 FY99 FY96 COMMENTS <br /># <br /># <br />1.1.1 <br />TASK <br />Restore the diversity of riverine <br />habitats by reconnecting cutoff <br />(YRS) <br />20 <br />Rey. <br />3,4, <br />6 <br />riog. <br />ES,FFA <br />WR <br />COE,BR, <br />FERC <br />U N K N 0 W N <br />costs dependent upon numbers of <br />restorations. <br />1 <br />features along the Missouri and <br />Mississippi Rivers. <br />Implement operational alternatives for <br />main stem Missouri River and tributary <br />dams using simulation models that will <br />emulate precontrol hydrographs. <br />Restore the natural temperature regime <br />1 <br />1.1.2 <br />Perpet- <br />ual <br />5 <br />6 <br />6 <br />ES,FFA <br />ES,FFA <br />COE,BR, <br />WAPA, <br />FERC <br />I <br />COE,BR <br />U N K N 0 W N <br />U N K N 0 W N <br />No direct costs associated with <br />modifying operations; however, <br />indirect costs from losses to other <br />beneficial uses will be incurred. <br />Cost for upper- reservoir discharge <br />unknown until implementation of Task <br />1 <br />1.1.3 <br />of the Missouri River. <br />2.2.3. <br />Restore Large woody debris to the main <br />stem Missouri and Mississippi Rivers <br />5 <br />3,4, <br />6 <br />ES,FFA <br />COE,EPA <br />15 15 15 <br />Local communities could benefit and <br />provide cost -share funding. <br />1 <br />1.1.4 <br />and their larger tributaries. <br />Restore the dynamic equilibrium of <br />sediment transport within the Missouri <br />15 <br />6 <br />ES,FFA <br />COE,BR, <br />EPA,FERC <br />U N K N 0 W N <br />Costs unknown until implementation of <br />Task 2.2.4. <br />1 <br />1.1.5 <br />River. <br />Restore free movements of pallid <br />20 <br />6 <br />ES,FFA <br />COE,BR <br />U N K N O W N <br />1 <br />1.1.6 <br />sturgeon within high priority recovery <br />areas. <br />Ensure Federal Agencies conduct <br />section 7 consultations on all Federal <br />actions that may affect pallid <br />sturgeon. <br />Establish, maintain, and disseminate <br />Until <br />delist- <br />ed <br />3,4, <br />6 <br />ES <br />COE,BR, <br />WAPA, <br />EPA, <br />FERC <br />U N K N O W N <br />Costs dependent upon numbers of <br />consultations. <br />1 <br />1.2.1 <br />1 <br />6 <br />ES <br />5 <br />1 <br />1.2.2 <br />section 7 biological opinions <br />evaluating impacts on pallid sturgeon. <br />EN <br />
The URL can be used to link to this page
Your browser does not support the video tag.