My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte River Projects WY to NE
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
North Platte River Projects WY to NE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2013 5:17:03 PM
Creation date
3/5/2013 5:11:54 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to Platte River Endangered Species Partnership (aka Platte River Recovery Implementation Program or PRRIP)
State
NE
WY
Basin
North Platte
Author
U.S. Department of the Interior, Bureau of Reclamation
Title
North Platte River Projects Wyoming - Nebraska
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />Cover. Pathfinder Dam <br />To the pioneers traveling West in the <br />1800's, the North Platte River provided a <br />valley roadway West across much of <br />Nebraska and Wyoming. <br />The emigrants wrote to their friends and <br />relatives in the East of their arduous <br />journey. They described such landmarks <br />as Scotts Bluff and Register Cliff as well <br />as the dry prairie above the river. Few of <br />these rugged travelers thought of settling <br />in this and land. <br />Around 1900, good farmland in the Middle <br />West became scarce. Congress passed <br />the Reclamation Act of 1902 to help satisfy <br />the dream of those who hoped to farm their <br />own land. The Act provided for construction <br />of dams and irrigation systems in the <br />Western States. <br />An irrigation project in the North Platte <br />Valley was one of the first six authorized <br />on March 14, 1903. Additional projects <br />have been added over the years to improve <br />regulation of the river. Meanwhile, the <br />scope of Reclamation's activities has <br />broadened to include hydroelectric power <br />generation, recreation, flood control, <br />municipal and industrial water, and fish and <br />wildlife enhancement. <br />Today, the North Platte boasts five major <br />reservoirs and six powerplants. Enough <br />water is stored to irrigate 400,000 acres of <br />productive farmland. The value of crops <br />grown each year exceeds the total original <br />construction cost of $132 million. <br />Although flood control is an authorized <br />function only at Glendo Reservoir, the <br />other reservoirs have provided flood <br />control as an incidental benefit. Over $35 <br />million in flood damages have been <br />prevented by the entire system. <br />The benefits of Reclamation's program <br />have improved the lives of residents of the <br />West. The North Platte River Basin is no <br />exception. Whether it's fishing at a <br />Reclamation reservoir, turning on an <br />electric switch, or drinking a glass of water, <br />Reclamation has made a difference in <br />western life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.