Laserfiche WebLink
Budget and Schedule Estimate Details <br />Task Description <br />Labor <br />Rate <br />($ /day) <br />Staff Days <br />Labor <br />Cost <br />Year 1 <br />Year 2 <br />Year 3 <br />Year 4 <br />Yrs 5 -13 <br />Totals <br />A. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />B. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />C. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />111 <br />Develop Geomorphic Assessment Work Plan <br />Organize appropriate committee to lead geomorphic assessment <br />Contract with consultants to participate in geomorphic assessment <br />Compile bibliography of all relevant geomorphic data and coverages <br />Collect, review existing aerial photos and existing GIS coverages including COHYST <br />Evaluate existing geomorphic data regarding channel characteristics and slopes <br />Identify key gaps in geomorphic data and plan new data collection <br />Pre -plan geomorphic data analysis (what will we do with the new data ?) <br />Pre -plan appropriate classification system for characterizing the Platte's morphology <br />Revise geomorphic data collection plan <br />Pre -plan field work (equipment, access, scheduling, dataforms, etc.) <br />Determine specific locations for field inspection <br />Negotiate agreements for access, monumentation, helicopter, use of airboat, etc. <br />Establish protocol for field work and data quality, assume 90 miles of survey <br />Negotiate contract for Lidar imagery, assume 90 miles of survey <br />Interim report - "Geomorphic Data Collection and Analysis Plan" <br />Basic Geomorphic Data Collection (including Field Data) <br />Compile all previous width measurements, including Carter Johnson "areas" <br />Compile, categorize and RATE all existing planform and other geographic data, measurements and <br />coverages <br />Scan, register, categorize, and RATE all unscanned imagery of river planform <br />Field verify geomorphic nuances identifed from existing geographic imagery <br />Install /field verify controls for geomorphic surveys <br />Reconnaissance observations of banks, bars, shoals, bedforms, islands and georeferenced video <br />Detailed GPS measurements of water surface profiles and bed profiles if possible <br />Set ground control for Lidar imagery <br />Acquire Lidar imagery <br />Acquire Lidar digital topography <br />Field inspection of flow patterns at/near Kearney diversion - two occasions <br />Sediment transport measurements at/near Kearney diversion - two different flows <br />Detailed width measurements at/near Kearney diversion <br />Interim report - "Summary of Platte River Geomorphic Database" <br />Analysis of Geomorphic Data <br />Establish relevant geomorphic parameters and best means of measuring them <br />Develop GIS database of pre - existing and newly acquired field measurements <br />Download Lidar topo to GIS database <br />Measure relevant dimensions from best available imagery/data /coverages <br />Classical geomorphologic measures (channel form, braiding indices, wavelength, etc.) <br />Classify river reaches by adopted classification system from A.8 <br />Subclassification of macroforms, cross - sections, bars, islands, etc. <br />Develop, adopt applicable definition of "width" W <br />Measure, tabulate "W's" from GIS database <br />Re- calculate effective discharge and assess associated active channel width <br />Integrate Carter Johnson data in GIS and geomorphic classification system <br />1000 <br />800 <br />800 <br />600 <br />800 <br />1000 <br />1000 <br />1000 <br />800 <br />800 <br />800 <br />600 <br />800 <br />600 <br />800 <br />800 <br />800 <br />600 <br />1000 <br />600 <br />800 <br />600 <br />600 <br />1000 <br />1000 <br />600 <br />800 <br />600 <br />800 <br />1000 <br />600 <br />600 <br />800 <br />800 <br />1000 <br />800 <br />1000 <br />800 <br />800 <br />800 <br />5 <br />4 <br />10 <br />10 <br />8 <br />8 <br />4 <br />4 <br />2 <br />6 <br />4 <br />10 <br />4 <br />4 <br />10 <br />4 <br />10 <br />12 <br />10 <br />10 <br />12 <br />2 <br />4 <br />4 <br />10 <br />8 <br />20 <br />14 <br />20 <br />8 <br />4 <br />4 <br />8 <br />20 <br />30 <br />4 <br />10 <br />20 <br />10 <br />10 <br />4 <br />10 <br />10 <br />4 <br />20 <br />6 <br />6 <br />0 <br />$0 <br />5 <br />$5,000 <br />4 <br />$3,200 <br />10 <br />$8,000 <br />10 <br />$6,000 <br />8 <br />$6,400 <br />8 <br />$8,000 <br />4 <br />$4,000 <br />4 <br />$4,000 <br />2 <br />$1,600 <br />6 <br />$4,800 <br />4 <br />$3,200 <br />10 <br />$6,000 <br />4 <br />$3,200 <br />4 <br />$2,400 <br />10 <br />$8,000 <br />0 <br />$0 <br />0 <br />$0 <br />4 <br />$3,200 <br />10 <br />$8,000 <br />12 <br />$7,200 <br />10 <br />$10,000 <br />10 <br />$6,000 <br />14 <br />$11,200 <br />40 <br />$24,000 <br />12 <br />$7,200 <br />8 <br />$8,000 <br />14 <br />$14,000 <br />8 <br />$4,800 <br />8 <br />$6,400 <br />8 <br />$4,800 <br />30 <br />24,000 <br />0 <br />0 <br />0 <br />$0 <br />8 <br />$8,000 <br />50 <br />$30,000 <br />4 <br />$2,400 <br />10 <br />$8,000 <br />20 <br />$16,000 <br />10 <br />10,000 <br />10 <br />$8,000 <br />4 <br />$4,000 <br />10 <br />$8,000 <br />10 <br />$8,000 <br />4 <br />$3,200 <br />