My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erosion, Transport and Deposition Process
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Erosion, Transport and Deposition Process
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2013 3:53:37 PM
Creation date
3/4/2013 1:49:28 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Cooperative Agreement [CA]; aka Platte River Recovery Implementation Program [PRRIP])
State
CO
NE
WY
Basin
South Platte
Water Division
1
Title
Budget and Schedule Estimate Details - Technical Committee
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />I 3 <br />4 <br />1( <br />11 <br />1� <br />Budget and Schedule Estimate Details <br />Labor <br />($ /day) <br />Staff Days <br />Labor <br />Cost <br />Task Description <br />Year 1 <br />Year 2 <br />Year 3 <br />Year 4 <br />Yrs 5 -13 <br />Totals <br />Sediment Transport Processes and Characteristics <br />$0 <br />Collect complete hydraulic and total- sediment - transport measurements: <br />0 <br />$0 <br />5 measurements per gauging station per year X 5 stations (incl. Cozad) <br />0 <br />$0 <br />Develop sediment rating curves and sand budgets by grain size <br />800 <br />40 <br />40 <br />40 <br />40 <br />40 <br />200 <br />$160,000 <br />Refine, calibrate, and verify sediment transport component of the <br />1000 <br />100 <br />100 <br />100 <br />100 <br />100 <br />500 <br />$500,000 <br />SEDVEG model <br />0 <br />$0 <br />0 <br />$0 <br />Lateral erosion /accretion <br />0 <br />$0 <br />Analysis of bank line changes (using available aerial & ground surveys) <br />1000 <br />30 <br />30 <br />40 <br />100 <br />$100,000 <br />Coordination with bed incision to separate lateral and vertical processes <br />1000 <br />30 <br />30 <br />40 <br />100 <br />$100,000 <br />Review applicability of other models of lateral processes <br />800 <br />6 <br />10 <br />6 <br />22 <br />$17,600 <br />Refinement, calibration, and verification of lateral processes <br />1000 <br />40 <br />40 <br />40 <br />120 <br />$120,000 <br />0 <br />$0 <br />Detailed Data Collection for Sand Bar /Bedform /Island Processes <br />0 <br />$0 <br />Develop monitoring plan for new sites and cooperative efforts with others <br />1000 <br />10 <br />10 <br />$10,000 <br />Coordinate with USGS at Cottonwood and Lowe Sanctuary <br />800 <br />2 <br />2 <br />2 <br />6 <br />$4,800 <br />From aerial or boat survey, identify 6 locations for detailed monitoring <br />800 <br />6 <br />6 <br />$4,800 <br />Install monuments and instrumentatation, including time -lapse camera <br />600 <br />30 <br />30 <br />$18,000 <br />Conduct initial detailed hydraulic, sediment and topo survey of 6 reaches <br />800 <br />50 <br />50 <br />$40,000 <br />Conduct re- measurements of 6 reaches, assume 4 per year <br />600 <br />75 <br />75 <br />50 <br />200 <br />$120,000 <br />Reach visits to replace film, service equipment, download data (4 /yr) <br />600 <br />12 <br />12 <br />12 <br />36 <br />$21,600 <br />0 <br />$0 <br />i Analvze Sandbar /Bedform /Island Formation and Removal Processes <br />0 <br />$0 <br />Coordination with field data collection teams <br />800 <br />1 <br />1 <br />2 <br />$1,600 <br />Coordination with GIS team <br />800 <br />1 <br />1 <br />2 <br />$1,600 <br />Coordinate with USGS at Cottonwood and Rowe Sanctuary <br />800 <br />1 <br />1 <br />1 <br />3 <br />$2,400 <br />Coordinate with USGS lab tests <br />600 <br />1 <br />1 <br />$600 <br />i Develop analytical tools for assessing bar /bedform /island processes <br />1000 <br />20 <br />20 <br />40 <br />$40,000 <br />i Coordinate w/ USGS 2 -D Modeling <br />1000 <br />5 <br />5 <br />10 <br />$10,000 <br />Test analytical tools with field data <br />800 <br />15 <br />20 <br />35 <br />$28,000 <br />S Field monitoring during high flows <br />600 <br />5 <br />5 <br />5 <br />15 <br />$9,000 <br />Monitor two other sand bar construction methods <br />800 <br />10 <br />10 <br />20 <br />$16,000 <br />Analyze geomorphic data on sand bar /island locations in planform <br />1000 <br />10 <br />10 <br />$10,000 <br />Coordinate with biolgists on acceptability /use of sand bars <br />1000 <br />1 <br />1 <br />$1,000 <br />> Compare observations with literature descriptions of processes <br />1000 <br />2 <br />4 <br />6 <br />$6,000 <br />Report <br />22 <br />22 <br />$0 <br />Total Staff Days <br />4711 <br />3991 <br />3971 <br />1401 <br />1401 <br />15471 <br />$1,343,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.