My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Incorporation of Governance Committee Comments on draft IMRC
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
Incorporation of Governance Committee Comments on draft IMRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2013 3:49:30 PM
Creation date
3/4/2013 1:44:52 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to the Platte River Endangered Species Partnership (aka Platte River Cooperative Agreement [CA]; aka Platte River Recovery Implementation Program [PRRIP])
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
9/19/2000
Author
PRRIP Technical Committee
Title
RE: Incorporation of Governance Committee Comments on draft IMRC
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO: Governance Committee Members, Alternates, and Others <br />FROM: Technical Committee <br />RE: Incorporation of Governance Committee Comments on draft IMRC <br />The Technical Committee (TC) received comments from representatives of the Department of <br />Interior, Down Stream Water Users, South Platte Water Users, the State of Wyoming, and the <br />State of Colorado on the October 6, 1999 draft "Integrated Monitoring and Research <br />Component" (IMRC). This memo outlines major points raised in the comments as well as where <br />the points were addressed in the current draft IMRC. <br />Point 1: Clarification of Adaptive Management Questions, Use, and Reporting <br />Several comments asked for further explanation of how and when adaptive management will be <br />used. The existing IMRC contained an extensive section on the general concepts of adaptive <br />management and how adaptive management was discussed in the Cooperative Agreement. <br />Section V. Adaptive Management, was expanded to include further clarification on the different <br />levels of adaptive management as well as when and how adaptive management would occur. <br />Clarification regarding project level adaptive management and Program adaptive management <br />was also included in Section I. Introduction. Section IV.C. Reporting was added to give an <br />example of how reporting for adaptive management purposes may oc(;ur during the Program. <br />Further clarification from the Department of Interior is needed to determine how the IMRC <br />should be edited to incorporate the comment that "the adaptive management section should <br />explicitly state and fully discuss the specific questions Program managers will face in the Platte <br />River Basin." <br />Point 2: Statement of Quantifiable /Measurable Objectives <br />One comment asked that Quantifiable /Measurable Objectives for use in adaptive management <br />and for evaluating the effectiveness of Program management actions be Mcluded in the IMRC. <br />Through discussion at the December TC meeting it was understood that the comment was asking <br />for Quantifiable /Measurable Objectives as they relate to habitat (e.g., acres of wet meadow <br />habitat protected) and water, not species Quantifiable/Measurable Objectives. This concern will "1 <br />be addressed in the Habitat Protection Plan and Water Action Plan and not specifically in the <br />IMRC. <br />Point 3: Budget <br />The TC included a very rough estimate for the proposed monitoring and. research component of <br />the Program. Several comments expressed concern that the estimate was too high and that too <br />many activities were identified. One comment asked that the budget section of the IMRC be <br />removed. To address these concerns, the document was modified in Section XI. Estimated <br />Budget, by explaining that the budget will be better defined through protocol development and <br />consideration of collaborative projects. The overall budget was removed from the IMRC but <br />budget estimates will be provided to the FC for their use. The tables outlining proposed <br />monitoring and research activities were moved to Section XII. Protocol Development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.