My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spring 2001 Whooping Crane Migrational Survey Protocol Implementation Report
CWCB
>
Water Supply Protection
>
DayForward
>
7001-8000
>
Spring 2001 Whooping Crane Migrational Survey Protocol Implementation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2014 3:07:22 PM
Creation date
3/1/2013 2:13:00 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Endangered Species Partnership (aka Platte River Cooperative Agreement [CA]; aka Platte River Recovery Implementation Program [PRRIP]) Technical Advisory Committee (TAC)
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
11/19/2001
Author
Platte River Cooperative Agreement Technical Advisory Committee
Title
Spring 2001 Whooping Crane Migrational Survey Protocol Implementation Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VIII. ADMINSTRATION <br />IX. EXISTING DATA EVALUATION <br />Includes: Cooperative Migration Tracking (Site Evaluation Form), FWS River Use Site <br />Evaluation Forms, FWS GIS database of use sites <br />X. DATA SHEETS <br />Aerial Survey Log — to be supplied prior to implementation of field work <br />Movement Tracking — to be supplied prior to implementation of field work <br />Time Budget — to be supplied prior to implementation of field work <br />Program Site Use Data Form — to be supplied prior to implementation of field work. <br />FWS Whooping Crane Riverine Use -Site Channel Profile and Site Evaluation Form (see <br />attached file) <br />XI. BIBLIOGRAPHY <br />XII. ESTIMATED 2001 SPRING BUDGET <br />Estimated Budget for Monitoring Whooping Crane Migrational Habitat Use <br />(assumes having crew available, after training, March 10 - April 30, 2001) <br />Estimated Contractor and Technician Budget <br />Personnel <br />Project Management/Coordination <br />120 hrs <br />$60 /hr <br />$7,200 <br />Detecting /Locating Whooping Crane Stopovers <br />Technicians (4 persons, 20hrs /week,8 weeks) <br />720 hrs <br />$25 /hr <br />$18,000 <br />Movement Tracking /Use Site Measurements <br />Technicians (4 persons, 20hrs /week,8 weeks) <br />720 hrs <br />$25 /hr <br />$18,000 <br />Data transfer and Methods Description <br />16 hrs <br />$60 /hr <br />$960 <br />Subtotal <br />$44,160 <br />Direct Costs <br />Daily Flights (2 planes; 1 local) <br />280 hrs <br />$1151hr <br />$32,200 <br />Vehicles (2 trucks, 8 weeks) <br />16 weeks <br />$450 /wk <br />$7,200 <br />Technician Housing (2 apts) <br />2 months <br />$650 /apt/mo <br />$2,600 <br />Pilot Per Diem (assumes 1 local pilot) <br />45 days <br />$80 /day <br />$3,600 <br />Communications <br />$500 <br />Fax/Copies <br />$150 <br />Maps /Aerial Photos /Survey Photos <br />$1,000 <br />Supplies (Range finder, GPS units) <br />$1,000 <br />Subtotal <br />$48,250 <br />Estimated Contractor/Technician Budget <br />$92,410 <br />February 23, 2001 <br />Draft — WC Monitoring Protocol <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.