Laserfiche WebLink
9 Microsoft Access Database <br />0 <br />➢ Correct the "Aerial Surveys II" form so that the correct number of flights appears in the <br />"WC Flight Surveys" table. Currently, an extra line is added in the table. <br />➢ Correct the " "Use Site Monitoring" form so that the correct number of records appears in <br />the "WC Use Instantaneous Points" table. Duplicate points are added in the table. <br />➢ Present discharge during use and when measured including dates for both in a Table. <br />➢ Add "Crane Group ID" to the Use Characteristics form. <br />➢ Add "Use Site ID" and "Crane Group ID" to the Aerial Observations form and link it to <br />the Whooping Crane locations Table. <br />➢ Change Ground Monitoring to Ground Search <br />➢ Delete "activity" in locations subform of Use Site Monitoring form. <br />➢ Delete "vegetation" in the instant points subform of the Use Site Monitoring form. <br />➢ Automate "instant point ids" in the Use Site Monitoring form. <br />➢ Round the UTM's to whole numbers in the Decoy Information table. <br />➢ Add a query to calculate count and percent of time in various habitats from the Use <br />Locations table. <br />➢ Incorporate additional USFWS confirmed sightings of Whooping Cranes on the Platte <br />River into this database so that it is all inclusive. <br />Methods <br />➢ 210 decoys have been placed since the inception of the Whooping Crane monitoring <br />protocol. Consider whether it is necessary to continue collecting river profile information <br />at decoy locations. <br />➢ Eliminate transect 3 from the aerial survey since no observations of Whooping Cranes <br />have occurred on these transects to date and the likelihood of observing Whooping <br />Cranes on these transects is remote given the time of day flights occur. <br />➢ Update aerial photos of river with aerial survey routes overlaid on them. <br />Spring 2008 Expenses <br />The cost of the field implementation of this project was about $51,029. The total cost of <br />the Spring 2008 effort was about $53,467. <br />Supplements <br />Original Data Sheets <br />CD containing the Microsoft Access database, MS Word final report file, and selected <br />photographs. <br />Final Spring 2008 Whooping Crane Monitoring Report 9 <br />6/20/2008 <br />