Laserfiche WebLink
Part III - Project Report Index <br />Fourteen applied recharge demonstration projects were sponsored through the High Plains <br />States Groundwater Demonstration Program to evaluate the feasibility and effective <br />application of groundwater recharge under a range of hydrogeologic conditions and <br />institutional circumstances that can influence project planning. A final project report was <br />prepared upon completion of the program demonstration investigations. These final <br />project reports were subsequently used to prepare a summary report of consistent scope <br />and size to reduce costs and allow efficient distribution as program products. <br />The project summary reports were released as projects were completed. Thirteen project <br />summary reports were published previously, and one last summary report is provided here <br />as part of the overall program report. Project summary reports are reproduced without <br />modification of their original publication content. The summary reports are presented in <br />alphabetical order by the State location, as indicated in table 1. <br />Table 1. Index to Project Summary Report Publication <br />State Location <br />Project Name <br />Summary Report Date <br />Arizona <br />Rillito Creek <br />November 1996 <br />Colorado <br />Denver Basin <br />March 1997 <br />Idaho <br />Southwest Irrigation District <br />July 1999 <br />Kansas <br />Equus Beds <br />Issued in this report <br />Montana <br />Turner - Hogeland <br />July 1999 <br />Nebraska <br />Wood River <br />March 1998 <br />Nebraska <br />York Project <br />December 1997 <br />Nevada <br />Washoe <br />December 1996 <br />Oklahoma <br />Blaine Gypsum <br />April 1998 <br />Oregon <br />Hermiston <br />June 1997 <br />South Dakota <br />Huron <br />July 1999 <br />Texas <br />Hueco Bolson <br />April 1996 <br />Utah <br />Southeast Salt Lake <br />February 1996 <br />Washington <br />Highline Well Field <br />June 1996 <br />