Laserfiche WebLink
CONTENTS <br />1. INTRODUCTION 1 -1 <br />1.1 PURPOSE AND NEED FOR ACTION <br />1 -1 <br />1.2 HISTORY OF THE PROCEEDINGS <br />1 -1 <br />1.3 ENDANGERED SPECIES ACT CONSULTATION <br />1 -3 <br />1.4 PRINCIPAL RESOURCE CONSIDERATIONS <br />1 -4 <br />1.4.1 Irrigation Water Supplies <br />1 -5 <br />1.4.2 Wildlife and Habitat Protection <br />1 -5 <br />1.4.3 Hydroelectric Generation <br />1 -6 <br />1.4.4 Recreational Opportunities <br />1-8 <br />2. PROPOSED ACTION AND ALTERNATIVES 2 -1 <br />2.1 DESCRIPTION OF THE PROJECTS AND CURRENT OPERATIONS <br />2 -2 <br />2.1.1 Project Facilities <br />2-2 <br />2.1.2 Current Project Operation <br />2-5 <br />2.2 INTERIM MEASURES <br />2-8 <br />2.3 NO- ACTION ALTERNATIVE <br />2 -9 <br />2.4 THE DISTRICTS' PROPOSAL <br />2-9 <br />2.4.1 Operating Scenario <br />2-9 <br />2.4.2 Water Conservation <br />2-12 <br />2.4.3 Wildlife, Recreation, and Cultural Resources Programs <br />2 -13 <br />2.5 NEBRASKA PLAN <br />2 -15 <br />2.5.1 Operating Criteria and Base Flows <br />2 -16 <br />2.5.2 Environmental Account <br />2 -19 <br />2.5.3 Supplemental Measures <br />2 -21 <br />2.6 MODIFIED NEBRASKA PLAN <br />2-21 <br />2.6.1 Water Conservation Measures <br />2-21 <br />2.6.2 Wildlife Habitat Measures <br />2 -36 <br />2.6.3 Project Operations And Instream Flows <br />2 -37 <br />2.6.4 Other Measures <br />2-38 <br />2.7 NGPC PLAN <br />2 -39 <br />2.8 TRUST PLAN <br />2-40 <br />2.9 CONSERVATION INTERVENORS PLAN <br />2-42 <br />2.10 INSTREAM ENHANCEMENT ALTERNATIVE <br />2 -43 <br />2.11 INTERIOR PLAN <br />2-44 <br />2.11.1 Reservoir Operation <br />2-45 <br />2.11.2 Water Conservation <br />2-46 <br />iii <br />